06.02.2023
47 / 154
STRATTON MK3 - Installation, Use and Maintenance
6. CHECKS AFTER COMMISSIONING
6.1. Condensate removal
Check that the removal of condensate is not obstructed, on both the boiler side
and the pipe side.
6.2. Gas supply
Check that the gas pipe diameter is correctly sized:
It is necessary to stop all the boilers together abruptly using the boiler room
main circuit breaker to check that the gas pressure regulator safety device is
not triggered.
If this is triggered, the gas pipe is undersized. After this operation, reengage the
circuit breaker. The boilers must start automatically, if not, consult the supplier
of the gas pressure regulator.
Содержание STRATTON MK3 Series
Страница 2: ......
Страница 13: ...06 02 2023 13 154 STRATTON MK3 Installation Use and Maintenance...
Страница 44: ...44 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C Figure 19 Wiring diagram...
Страница 45: ...06 02 2023 45 154 STRATTON MK3 Installation Use and Maintenance...
Страница 149: ...06 02 2023 149 154 STRATTON MK3 Installation Use and Maintenance...
Страница 150: ...150 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Страница 151: ...06 02 2023 151 154 STRATTON MK3 Installation Use and Maintenance...
Страница 152: ...152 154 STRATTON MK3 Installation Use and Maintenance 00U07428680 C...
Страница 153: ...06 02 2023 153 154 STRATTON MK3 Installation Use and Maintenance...