HAMWORTHY HEATING LTD
4
PUREWELL
Variheat mk2
218612 A03
3.0
SIZE AND SPACE REQUIREMENTS
3.1 The Purewell Variheat
mk2
boiler range has been designed to utilise minimum floor space, therefore it is important the
plantroom has sufficient ceiling height to allow for installation and connection to the flue system.
A minimum distance of 50mm must be maintained from easily flammable materials
Also important is allowance for sufficient access at front, sides and rear of boiler for flue and pipework connections.
Ensure a minimum height of 150mm above the boiler for removal of the covers.
Do not run cabling through the top or display covers.
See Figure 3.1 below.
3.2 The Hamworthy Heating Ltd water manifold kit is designed to provide a compact solution for connecting the boilers to
the gas supply and flow and return water connections. (Refer to the Manifold Kit Installer’s Guide
for specific details.)
Figure 3.1 - Dimensions and Clearances
Figure 3.2.1 – Manifold Dimensions for a 2 Purewell Variheat
mk2 boiler installation
Содержание Purewell Variheat mk2 70c
Страница 30: ...HAMWORTHY HEATING LTD 25 PUREWELL Variheat mk2 218612 A03 Figure 9 0 Boiler Wiring Schematic...
Страница 43: ...HAMWORTHY HEATING LTD 38 PUREWELL Variheat mk2 218612 A03...
Страница 53: ...HAMWORTHY HEATING LTD 48 PUREWELL Variheat mk2 218612 A03 Figure E1 2 Typical Piping Layouts...
Страница 68: ...HAMWORTHY HEATING LTD 63 PUREWELL Variheat mk2 218612 A03 NOTES...
Страница 69: ...HAMWORTHY HEATING LTD 64 PUREWELL Variheat mk2 218612 A03 NOTES...
Страница 70: ...HAMWORTHY HEATING LTD 65 PUREWELL Variheat mk2 218612 A03 NOTES...
Страница 71: ...NOTES...