background image

Ensbury LT 70 - 580 

 

We reserve the right to make changes to dimensions and construction 

16 

edition 12.2020 

Hamworthy Heating Limited – Dorset BH17 ONF 

 

 

 

40 

45 

 

6.2.3.  Boiler support 

 

It is possible to mount the boiler on vibration dampers (available as option) to reduce noise transmission caused 

by vibrations. 

 

A-A 

B-B 

 

 

ca. 30 

 

 

 

 

 

 

with vibration dampers                                                                   without vibration dampers 

 

0005AX 

 

 

 

Ensbury LT  

 

70 

90 

120  145  165  190 

225  260  300  335    370  440  510    580 

Front and rear 

mm  1220  1220  1310  1310  1310  1310  1310  1310  1310  1310  1310  1600  1600  1600 

Boiler block length 

mm  1015  1015  1155  1155  1355  1355  1335  1615  1615  1615  1615  1870  1870  1870 

Boiler feet length 

mm 

844  844  986  986  1186  1186  1186  1445  1445  1445  1445  1701  1701  1701 

Boiler feet width 

mm 

640  640  740  740  740  740  790  790  790  870  870  938  938  938 

Vibration damper length 

mm 

130  130  130  130  130  130  130  274  274  274  274  274  274  274 

 

The mounting instructions for the silent blocks can be found in the separate assembly guide. 

 

 

Afterwards, you can start installing the connection tubes on the water side. 

 

Attention! 

Once the boiler is filled up, it will come down by further 2-3 mm. 

 

 

 

6.3.  Placement into the boiler room 

 

The boiler can be placed in position in various ways: 
The boiler is delivered on a wooden pallet that is suitable for a forklift truck, pallet roller or armored rollers. In 
addition, the boiler is equipped with a lifting eye and the boiler can be placed by means of lifting gear. 

 

 

After positioning the boiler, the wooden pallet must be removed. 

40 

Содержание Ensbury LT 70

Страница 1: ...Manual Ensbury GB doc edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF Installation and operating instructions Ensbury LT 70 580...

Страница 2: ......

Страница 3: ...quipment 14 5 4 Heating regulators 14 5 5 Cable set 14 6 Installation guide 15 6 1 Boiler room and boiler room ventilation 15 6 2 Planning dimensions 15 6 3 Placement into the boiler room 16 6 4 Hydra...

Страница 4: ...ust be free of halogens chlorine and fluorine compounds If there is any doubt the quality of the combustion air must be ensured with an external air intake ELECTRICAL INSTALLATION Electrical connectio...

Страница 5: ...users to obtain low emission values and safe operation in conformity with law provisions The boiler s thermal insulation is made of glass fiber felt that adheres to the boiler shell guaranteeing mini...

Страница 6: ...t pressure other pressures on request 6 0 bar g Min operating pressure 0 5 bar g Boiler supply and return pipe flanges PN 6 Safety cut out temperature 110 C Max operating temperature 90 C Operating te...

Страница 7: ...ired The fill water must be treated and whenever new water is added the make up water must also be treated Installations with multiple boilers require all of the boilers to be brought up simultaneousl...

Страница 8: ...o add buffer volumes to the plant s hydraulic system to avoid short operating cycles especially when the boiler is protected by an isolation plate heat exchanger Regarding the regulation of the instal...

Страница 9: ...1 4 1 1 4 1 1 4 1 1 2 1 1 2 1 1 2 Height supply connection n mm 757 757 835 835 835 835 900 900 900 978 978 1053 1053 1053 Height return connection r mm 757 757 835 835 835 835 933 933 933 993 993 106...

Страница 10: ...82 1086 Weight empty 10 bar G kg 328 329 478 479 541 542 617 711 712 909 911 1193 1196 1200 Lenght supply return f mm 114 114 114 05 07 TN 4 4 2 Divided version Also available as a custom made option...

Страница 11: ...5 0 95 0 95 0 95 0 95 0 95 1 95 1 Overall efficiency tm 40 C 30 3 95 6 95 7 95 7 95 8 95 8 95 9 95 9 95 9 96 0 96 0 96 0 96 0 96 0 96 0 Efficiency DIN4702 8 60 75 C N 2 93 7 93 9 94 0 94 1 94 2 94 3 9...

Страница 12: ...5 33 0 36 7 40 7 48 0 55 9 63 7 min 1 2 2 6 2 8 3 8 4 3 4 5 5 0 5 7 5 5 6 1 7 4 8 1 9 6 10 6 13 1 Exhaust gas mass flow max wet kg s 0 03 0 04 0 05 0 07 0 07 0 09 0 10 0 12 0 14 0 15 0 17 0 20 0 23 0...

Страница 13: ...m power of the boiler is limited by the minimum allowable flue gas temperature Consequently the modulation range increases when the average boiler temperature increases This is exemplary illustrated i...

Страница 14: ...and 2nd speed 2nd speed inactive for a NAVISTEM B2000 panel with RVS 63 regulator Overheat indicator Burner safety indicator External fault indicator Water thermometer 5 3 Additional equipment Timer...

Страница 15: ...solvents among others In addition halogen emissions are strongly suspected in the vicinity of dry cleaners hair dressing salons swimming pools printing offices and washing machines installed in the sa...

Страница 16: ...mm 844 844 986 986 1186 1186 1186 1445 1445 1445 1445 1701 1701 1701 Boiler feet width b mm 640 640 740 740 740 740 790 790 790 870 870 938 938 938 Vibration damper length e mm 130 130 130 130 130 130...

Страница 17: ...in the form of correctly used oxygen binding agents or chemicals If it is not possible to realize an installation without oxygen entrance a system separation must be set up using heat exchangers 6 5...

Страница 18: ...se that are open on the rear part in the direction of the combustion gas collector Also read and follow the instructions in the assembly guide L Da 0007AX Ensbury LT 70 90 120 145 165 190 225 260 300...

Страница 19: ...ce door flange pivot LS mm 45 45 45 45 45 45 45 45 45 45 45 45 45 45 Door thickness e mm 115 115 115 115 115 115 115 115 115 115 115 116 116 116 09 06 Burner tube lengths without consideration of an e...

Страница 20: ...9 Flue gas system The pertinent rules of technology and good practice as well as the country specific regulations and valid standards must be observed The Ensbury LT boilers have been developed using...

Страница 21: ...pumps should be switched off and all ventilating valves opened so that the air in the system can completely escape The filling process is finished when the operating pressure has been reached 7 4 Prot...

Страница 22: ...ound the burner tube has been filled with insulation material Whether the boiler door is closed properly Whether the heating system has been filled up with water and completely vented Whether the ther...

Страница 23: ...nnect supply and burner plug Burner LED is on Press burner reset button No oil Gas pressure insufficient Add oil Call the gas board Overheat temperature LED is on Safety thermostat has come into opera...

Страница 24: ...tem blowers Carry out burner maintenance according to the recommendations given in the burner manual Check fuel oil level Clean boiler and chimney 9 2 Boiler cleaning Boiler should be cleaned by your...

Страница 25: ...1550 mm 113165 1750 4 Smoke chamber lid seal 10 x length 113177 800 mm 113177 800 mm 113177 800 mm 113177 800 mm 113177 800 mm 113177 800 mm 5 Turbulator Pieces 120283 9 122517 9 122517 11 120284 11...

Страница 26: ...ction 26 edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF Wessex House New Fields Business Park Stonsford Road Poole Dorset BH17 ONF Tel 01202662500 Fax 01202 662522 seNice hamworthy heating...

Отзывы: