HG2200/HG2200AT
Operator’s Manual
Set Up and Configure
Burst Pipe - 77
Set Up Mast
1. Remove mast from storage position.
2. Ensure cable has eye (shown).
3. If cable does not have eye, use a mast stop
(shown).
Moving parts can crush and cut hand or foot. Stay away.
To help avoid injury:
•
Keep hands and fingers clear of the mast.
•
Ensure no personnel are in the pit as equipment is lowered.
•
Keep winch doors closed during operation.
j64om019w.eps
j64om024w.eps
Содержание HG2200
Страница 1: ...TECHNICAL PUBLICATIONS Operator s Manual HG2200 HG2200AT Issue 2 1 960 1119 Original Instruction ...
Страница 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls ...
Страница 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport ...
Страница 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe ...
Страница 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service ...
Страница 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications ...
Страница 136: ...HG2200 HG2200AT Operator s Manual Service Record 135 Service Record Service Performed Date Hours ...
Страница 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours ...
Страница 138: ...HG2200 HG2200AT Operator s Manual Appendix 137 Appendix Chapter Contents Tire Safety Information ...
Страница 146: ......