38
Setup and installation
7.2
Set-up and level
Unpack the machine and prepare for assembly
3
1
2
4
5
Fig. 19: Packaging - Machine base
1 Machine base - Front section
2 Machine base - Rear wall
3 Machine base - Side section
4 Wooden panel (packing material)
5 Pallet bracket
Unpack the machine base
Personnel:
●
Trained machine operator
For transport reasons the machine base is delivered dismantled.
1.
Remove the front section and rear wall from the machine.
2.
Remove the wooden panel from inside the machine.
3.
Remove the side section from the pallet.
4.
Remove all pallet brackets.
Place the machine on its side and mount the base
WARNING
Tipping over of the machine
Serious injury due to the high machine weight
−
Consider the machine weight and centre of gravity of the
machine.
−
Ensure that several additional assistants are on hand.
Содержание A2-26
Страница 6: ...6 Table of contents 12 3 Spare parts list 86 12 4 Circuit diagram 92 ...
Страница 67: ...67 A2 26 Maintenance 10 Maintenance ...
Страница 92: ...92 Attachment 12 4 Circuit diagram ...
Страница 93: ......