97093C (Rev. C - 10/99)
BFM-LR
PAGE 3
1. Familiarize yourself with the wallbox which should already be placed in the wall. If not, refer to the Wall frame Installations before
proceeding.
2. Remove noise pad from paper and locate on bottom back of the basin between the drain and the bubbler holes.
CAUTION: TO INSURE PAD DOES NOT INTERFERE WITH THE HOLE AREAS, TRIM THE PAD SO THERE IS APPROX. 1/2" CLEAR-
ANCE AROUND THE HOLES.
3. Determine location of rough plumbing.
4. Attach basin mounting brackets to basin studs located in the lower corners with two (2) provided wing nuts. Tighten securely.
5. Install basin. Place the upper edge of basin above the hangers in the wall frame. Slide the basin down until it engages the hanger.
Be sure basin is firmly engaged before releasing it.
6. Finish securing basin in place through the mounting bracket using the provided two (2)#8 x 3/4" tap screws and two (2) 11/64" ID
washers. Tighten securely.
7. Install waste tube assembly. Align threaded portion of drain tube assembly with the drain hole in the basin. Place rubber gasket
between the drain assembly and the basin, then screw in the drain plug from above. Tighten the drain plug. Snap the strainer plate
into the drain plug.
8. Install a service stop (not provided) on supply inlet line.
9. Make connection from water outlet to regulator valve assembly using the provided strainer. Insert water line in inlet side of strainer
(see Figures 1 and 2) to positive stop - approximately 3/4"(19 mm).
DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS
DAMAGE TO THE O-RINGS MAY RESULT.
10. Open service stop and operate push button to purge air from system. Check thoroughly for leaks. Check stream height from
bubbler. Stream height is factory set at 45-50 PSI. If supply pressure varies greatly from this, remove items 17 and 18 and adjust
screw on regulator (item 14). Clockwise adjustment will raise stream and CCW adjustment will lower stream height. For best
adjustment stream height should be approximately 1-1/2" (38 mm) above the bubbler guard. (See Figure 6).
11. Attach regulator housing (Item 13) to front panel (Item 3) with hex nut (Item 16). Install front panel. Hold panel and engage angle on
top edge of panel with lower edge of basin. Swing bottom of panel into place against the wall and secure using panel mounting
screws.
BEFORE STARTING THE INSTALLATION, PLEASE CHECK YOUR INSTALLATION
FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE
CODES
At 30" above the finished floor, cut a rectangular wall opening 17-1/8" wide by
30-1/8" high. This is required to obtain a rim height of 34-1/2" and 36" bubbler
spout height, which is in compliance with ANSI Standard A117.1 (See Fig. 4)
Reinforce wall opening on all sides so that it will adequately support the water
cooler. IT MUST SUPPORT UP TO 150 LBS. and provide a means of securing the
frame assembly in place.
Install rough-in plumbing. See Fig. 3 for location of supply water inlet and for
location of waste water outlet.
Install frame assembly in the wall opening with front edge flush with finished wall
face. Secure frame through holes in top and sides to wall support members with
5/16" diameter bolts or lag screws (not supplied). Six (6) bolts/screws are
required. CAUTION: BE SURE THAT FRAME ASSEMBLY IS SQUARED IN ITS
LOCATION AND DO NOT USE LESS THAN REQUIRED QUANTITY AND DIAMETER
OF THE FASTENERS.
WALLFRAME INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS
FIG. 4
WALL ROUGH-IN