97093C (Rev
. C - 10/99)
BFM-LR
PAGE 2
ROUGH-IN DIMENSIONS
FIG. 3
Страница 1: ...ROUNDING OF ELECTRICAL EQUIPMENT SUCHAS TELEPHONE COMPUTERS ETC TOWATER LINES IS A COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTOAFOUNTAIN CREATING AN ELECTROLYSIS WHICH CAUSESA METALLIC TASTE ORAN INCREASE IN THE METAL CONTENT OF THE WATER THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALSAS INDICA...
Страница 2: ...97093C Rev C 10 99 BFM LR PAGE 2 ROUGH IN DIMENSIONS FIG 3 ...
Страница 3: ...to purge air from system Check thoroughly for leaks Check stream height from bubbler Stream height is factory set at 45 50 PSI If supply pressure varies greatly from this remove items 17 and 18 and adjust screw on regulator item 14 Clockwise adjustment will raise stream and CCW adjustment will lower stream height For best adjustment stream height should be approximately 1 1 2 38 mm above the bubbl...
Страница 4: ...Cover Nut Chrome Cover Nut Golden Bronzetone Button Chrome Button Golden Bronzetone Strainer FIG 5 17 18 15 FRONT PANEL 14 16 13 FIG 7 TROUBLE SHOOTING AND MAINTENANCE CAUTION Cleaning of Golden Bronzetone Models requires special care Outer surfaces must be cleaned with a mild detergent or mixture of vinegar and water only rinsed and wiped dry Abrasive and acidic cleaners may eventually damage the...