HAKKEN SPO-14Ae-U Скачать руководство пользователя страница 1

 

 

 
 
 

 

DIAMOND CORE DRILL

 

SPO-14Ae-U 

 
 
 
 
 

  INSTRUCTION MANUAL   

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 

  Thank you for purchasing our products. 

  Before using, please read Instruction manual carefully, and use the machine 

safely by following the instructions. 

  After reading, please keep it where anyone can utilize. 

Содержание SPO-14Ae-U

Страница 1: ...e U INSTRUCTION MANUAL Thank you for purchasing our products Before using please read Instruction manual carefully and use the machine safely by following the instructions After reading please keep it...

Страница 2: ...njured CAUTION It is assumed that if the user uses the machine wrongly it would be the risks that the user could remain the disabled or damage for the materials CAUTION might cause the serious acciden...

Страница 3: ...ECIFICATIONS 7 4 STANDARD ACCESSORIES 7 5 APPLICATIONS 7 6 GENERAL DRAWING AND SPECIFICATIONS IN OPERATION 8 7 OPERATIONAL INSTRUCTIONS 1 Anchoring Core Dill 9 2 Anchoring Core Drill by Anchor Bolt 9...

Страница 4: ...g parts Wear rubber gloves and slip stopper footwear Wear cap or hair cover if you have long hair 5 Wear safety glasses Wear safety glasses during working If there is dust please wear the dust mask 6...

Страница 5: ...ch please make sure that the key and the wrench which are used for the inspection and adjusting are removed 14 The electric machines are maintained carefully Regarding exchanging the options please fo...

Страница 6: ...oper voltage which is indicated on the nameplate In case that you apply for the voltage which is over the indicated voltage it will cause the accidents 7 Fix the Pole Base properly It is extremely imp...

Страница 7: ...ng your hands from the feeding handle please make sure that L bolt is tighten then fix the Drill Head When loosening L bolt please hold the feeding handle in order not to move the Drill Head 3 For Mou...

Страница 8: ...hing Screw Hole M8 P1 25 Depth 23mm 198 CEE17 Plug Cord0 2m Motor Switch Built in Circuit Breaker Carbon Cap Unified screw 1 1 4 7 UNC 496 148 Speed Change Knob Hose Band 00 Standard Accessories Hose...

Страница 9: ...Geared Motor Weight Excluding cord 13 6kg 4 STANDARD ACCESSORIES Hose Band 00 1 Hose 12 250 1 Water Cock 1 4 Gardena 1 Instruction Manual 1 5 APPLICATIONS This tool is Core Drill for drilling in concr...

Страница 10: ...CIFICATIONS IN OPERATION Core drill installed on to 59 Pole Base Feeding Handle Core Bit Water Collector 59 Pole Base Bolt Square Washer Hex Nut Leveling Bolt Water Collector Fitting 59 Drill Carriage...

Страница 11: ...o align main shaft with the hole to be drilled 5 Adjust leveling with leveling bolts so as to eliminate rattling of pole base After completion of adjustment secure leveling bolt with wing nut 6 Tighte...

Страница 12: ...Start drilling by turning feeding handle slowly until core bit in light contact with work surface While starting to drill apply light pressure on feeding handle until drill bit penetrates to 5 10mm d...

Страница 13: ...th the soapy water 2 Maintenance for motor After entire operation is over secure Drill Head onto Pole Base run motor with no load and remove dirt and dust from motor interior 2 Regular Servicing 1 Che...

Страница 14: ...ust the clutch using clutch adjusting tools 1 Set the speed change at HI 2 Remove Hex Socket Cap Plug 1 8 from Gear Case by Hex Bar Wrench 5mm 3 Insert the tip of Clutch Adjusting Pin into the hole wh...

Страница 15: ...rn the motor switch on for just a moment and make sure that the clutch is slipping without motor locking WARNING Be careful for the position of Single ended Wrench 36mm touching on pole See the drawin...

Страница 16: ...ts at a distance of 1 meter from the surface of the machinery and at height of 0 6 meter from the floor during no load operation 11 WARRANTY We will guarantee the HAKKEN Core Drill SPO 14Ae U for 6 mo...

Страница 17: ...ll the relevant provisions Product Name Diamond Core Drill Model SPO 14Ae U Council Directive 72 23 EEC 89 336 EEC 92 31 EEC 98 37 EC Relative Standard EN292 1 EN292 2 EN55014 IEC1029 1 IEC1029 2 6 Ye...

Страница 18: ...16 Main office 4 6 8 Shoko Center Nishi ku Hiroshima 733 0833 Japan International Department 1 7 5 1 Sakaimachi Naka ku Hiroshima 730 0853 Japan Phone 81 82 297 3231 Fax 81 82 297 3230 E0221 1...

Отзывы: