Disassembly and disposal
102
TOPlift L+ edition • Operating instructions • Betriebsanleitung
General overhauls of hoist, fall
arrester and control cabinet
A scheduled general overhaul of the rope hoist and the fall arrester by the
manufacturer is required at least every ten years from the date of manufacture or
after 250 hours of operation, depending on which occurs first.
In this case, please contact Hailo Wind Systems.
A scheduled general overhaul of the control is required every 20 years. Please
contact Hailo Wind Systems for the general overhaul.
20
Disassembly and disposal
Disassembly by qualified
personnel
Disassembly of the machine may only be carried out by authorised and trained
persons. If you do not have the appropriate personnel for professional
dismantling, please contact Hailo Wind Systems.
Risk of injuries and damage to
the environment
The machine is comprised of different materials. If not handled in the correct
manner, some materials can cause personal injuries and damage to the
environment.
Observe local, regional and international regulations and laws regarding waste
disposal!
Assign an authorised disposal company for professional disposal of the waste.
Environmental protection
ATTENTION
Danger of environmental pollution by improper disassembly and disposal.
The service lift should be dismantled and recycled in parts and by type of
material. Non-recyclable materials must be disposed of in an
environmentally friendly manner.
Collect leaking operating materials (e.g. oil or lubricants) in suitable
containers and dispose of them properly.
Environmentally hazardous materials must be handled properly and
disposed of properly.