background image

In

s

ta

ll

a

ti

o

n

 a

n

d

 O

p

e

r

a

ti

n

g

 I

n

s

tr

u

c

ti

o

n

s

SC-650/970

One and Two Door Vertical Chillers

Vertical Display and Storage

Содержание SC-970

Страница 1: ...In s t a lla t io n a n d O p e r a t in g In s t r u c t io n s SC 650 970 One and Two Door Vertical Chillers Vertical Display and Storage ...

Страница 2: ...NSTALLATION 1 1 Safety Information 3 1 2 Positioning the Cabinet 4 1 3 Fitting the Sign Unit 5 1 4 Fitting the Shelves 6 2 OPERATION 2 1 Cabinet Operation 7 3 MAINTENA N CE 3 1 Lighting 8 3 2 Cleaning 9 3 3 Advanced Servicing 10 TABLE OF C ONT EN TS 2 ...

Страница 3: ...o be installed or removed from the cabinet ensure all necessary safety precautions are observed Warning Do NOT overload the power supply Caution Disconnect the cabinet from the mains power supply before attempting any cleaning or maintenance INSTALLATION 1 10 SC 650 970 One and Two Door Vertical Chillers 3 2 Cleaning When necessary wipe both the interior and exterior of the cabinet with a damp clo...

Страница 4: ...be retrieved before the cabinet is positioned Do not overload the power supply Model SC 650 is rated at 3 45A Model SC 970 is rated at 4 46A Important For efficient operation of the cooler it is essential that adequate ventilation be provided above the refrigeration unit INSTALLATION 1 9 SC 650 970 One and Two Door Vertical Chillers Sign Light The SC 970 sign unit is fitted with a 21 Watt T5 fluor...

Страница 5: ...e 2 Sign Retaining Clip Sign Retaining Clip Sign Side Panel Sign Rear Panel Retaining Slot INSTALLATION 1 8 SC 650 970 One and Two Door Vertical Chillers 3 1 Lighting Cabinet Interior lights Depending on the model cabinet the chiller has either one or two interior side lights Each side light houses a 35 Watt T5 fluorescent tube Ø16mm x 1450mm which may be replaced without removing shelves or produ...

Страница 6: ...ast 75mm 3 above product loaded on the top shelf Figure 3 Shelf Clip Shelf Support Strip Shelf Clip Mark Shelf INSTALLATION 1 7 SC 650 970 One and Two Door Vertical Chillers 2 1 Cabinet Operation Connect the cabinet to the mains power supply and check operation of the refrigeration unit and cabinet lighting NOTE After moving the chiller allow the cabinet to stand for at least 30 minutes before con...

Отзывы: