Remarks:
A. Charging amount when out of factory excludes the refrigerant in the pipe.
B . Additional charging amount=actual length of liquid pipe*additional amount per meter liquid pipe
Additional charging amount=L1*0.35+L2*0.25+L3*0.17+L4*0.11+L5*0.054+L6*0.022
L1: total length of 22.22 liquid pipe L2: total length of 19.05 liquid pipe
L3: total length of 15.88 liquid pipe L4: total length of 12.7 liquid pipe
L5: total length of 9.52 liquid pipe L6:total length of 6.35 liquid pipe
6. Requestment of copper pipe specs and thickness
Exterior diameter(mm)
6.35
9.52
12.7
15.88
19.05
22.22
25.4
28.58
31.8
34.9
38.1
41.8
Remarks
Pipe thickness(mm)
more than 0.8
more than 0.8
more than 1.0
more than 1.0
more than 1.0(straight pipe)
more than 1.0
more than 1.0
more than 1.0
more than 1.1
more than 1.3
more than 1.4
more than 1.5
coil pipe
straight pipe
more than 1.0 (coil pipe)
Содержание MRV II AV08NMVERA
Страница 119: ...G R U P A d o o 119 Part 5 install the software 1 Install database Firstly install Mysql Database Next ...
Страница 120: ...G R U P A d o o 120 Next Next Next ...
Страница 123: ...G R U P A d o o 123 Select system DNS Click and add ...
Страница 125: ...G R U P A d o o 125 3 Software installation Next ...
Страница 129: ...G R U P A d o o 129 ...