Haier HSU-09LH13 Скачать руководство пользователя страница 1

No.001050

Installation Manual of Room Air Conditioner

Read this manual before installation

1.Driver
2.Hacksaw
3.Hole core drill
4.Spanner(17,19 and 26mm)

5.Torque wrench(17mm,22mm,26mm)
6.Pipe cutter
7.Flaring tool
8.Knife

9.Nipper

12.Reamer

10.Gas leakage detector or
     soap-and-water solution
11.Measuring tape

Explain sufficiently the operating means to the user
according to this manual.

A

B

C

D

E

F

G

Optional parts for piping

Mark

Parts name

Non-adhesive tape

Adhesive tape

Saddle(L.S) with screws

Connecting electric cable
for indoor and outdoor

Drain hose

Heating insulating material

Piping hole cover

Arrangement of piping directions

Rear left

Rear

right

Left

Below

Right

The marks from     to     in the figure are the parts numbers.

The distance between the indoor unit and the floor should be
more than 2m.

A

G

Attention must be paid to
the rising up of drain hose

more than 10cm

more than 10cm

A

C

No.

Accessory parts

Remote controller

R-03 dry battery

Mounting plate

Drain hose

Steel nail, cement

Screw

Plastic cap

Cover

Cushion

1

1

2

3

4

5

6

7

8

9

2

1

1

6

4

1

4

1

Number
    of
articles

Accessory parts

4X50

4X25

Pipe supporting plate

more than 10cm

more than 60cm

more than 15cm

more than 10cm

D

E

more than 5cm

Drawing for the installation of indoor and outdoor units

Necessary Tools for Installation

Содержание HSU-09LH13

Страница 1: ...Drain hose Heating insulating material Piping hole cover Arrangement of piping directions Rear left Rear right Left Below Right The marks from to in the figure are the parts numbers The distance between the indoor unit and the floor should be more than 2m A G Attention must be paid to the rising up of drain hose more than 10cm more than 10cm A C No Accessory parts Remote controller R 03 dry batter...

Страница 2: ...lamps can be left In the case of fixing the remote controller on a wall place where the indoor unit can receive signals when the fluorescent lamps in the room are lightened Place which is less affected by rain or direct sunlight and is sufficiently ventilated Place possible to bear the unit where vibration and noise are not increased Place where discharged wind and noise do not cause a nuisance to...

Страница 3: ... the mounting plate is first fixed for the position of wall hole Fix to side bar and lintel a mounting bar Which is separately sold and then fasten the plate to the fixed mounting bar Make a hole of 70 mm in diameter slightly descending to outside the wall Install piping hole cover and seal it off with putty after installation Section of wall hole Piping hole pipe Outdoor side Thickness of wall In...

Страница 4: ... aslant from the underside and then put it down perpendicularly Remove terminal cover at right bottom corner of indoor unit then take off wiring cover by removing its screws When connecting the cable after installing the indoor unit 1 Insert from outside the room cable into left side of the wall hole in which the pipe has already existed 2 Pull out the cable on the front side and connect the cable...

Страница 5: ... the front side Loosen the screws and insert the cable ends fully into terminal block then tighten the screws Pull the cable slightly to make sure the cables have been properly inserted and tightened After the cable connection never fail to fasten the connected cable with the wiring cover Note When connecting the cable confirm the terminal number of indoor and outdoor units carefully If wiring is ...

Страница 6: ... wiring is not correct proper operation can not be carried out and controller may be damaged If the drain elbow is used please attach it as figure Note Only for heat pump unit Drawing for the installation of indoor and outdoor units Insert the cable according to terminal number in the same manner as the indoor unit Fix the cable with a clamp Half union Flare nut Spanner Torque wrench 6 Outdoor uni...

Страница 7: ...pecified torque 5 Tighten the caps on the valves with specified torque Valve rod Valve cap 7 9 20 25 Tighten torque N m When connecting pipe exceeds 5 meters 16g refrigerant shall be added per exceeding meter Charge according to the following list Piping length Additional amount 5m 7m 10m No need 32g During this procedure 50g refrigerant will be discharged in piping This must be strictly controlle...

Страница 8: ...door unit and confirm that drainage is carried out surely to outdoor In case that the attached drain hose is in a room please apply heat insulation to it without fail Please kindly explain to our customers how to operate through the instruction manual Gas leak from pipe connecting Heat insulation of pipe connecting Are the connecting wirings of indoor and outdoor firmly inserted to the terminal bl...

Отзывы: