STEP 5
Note:
Make sure the body of the keg coupler is in the closed (up) position
before installing it on the beer keg.
Install keg joining bracket to the first 1⁄4 barrel keg. Place one of the two keg
couplers onto the first (bottom) keg and turn clockwise to engage. To activate
push down the coupler and turn clockwise. BE SURE THAT THE HOSES ARE
OVER THE KEG JOINING BRACKET. It is normal to have some beer spray from
the keg during this process.
STEP 6
Place the second (top) keg into the top of the keg joining bracket
and tighten side screws. Place the remaining keg coupler onto the top keg and
turn clockwise to engage. To activate push down the coupler and turn clockwise.
It is normal to have some beer spray from the keg during this process.
IMPORTANT: The red and white hose of the bottom keg
should be routed over the split of the
joining bracket as shown in the picture.
Note: Be sure keg couplers are engaged completely
prior to inserting kegs in to the beer dispenser.
STEP 7
YOU MAY NOW TURN ON THE GAS AT THE TANK
AND OPEN BOTH BLACK HANDLES TO THE UP/DOWN
POSITION. With a flat head screw driver, turn screw on
top of regulator clockwise until the top gauge reads 8 PSI
STEP 8
At this time check the flow of beer by pulling each of the
taps forward. Make sure you use a container so as not to
spill the beer on the unit.
STEP 9
Remove the nut from the retainer bolt. Use two retainer fixing screws to secure
the retainer to the holes on the back of the cycliner. Then slide the cylinder
through the retainer and place it in the cabinet. Then tighten the retainer nut.
Carefully tilt the two beer kegs combination and rest the edge on the stainless
steel keg floor support on the bottom of the interior cabinet. Slide the kegs in
slowly, ensuring that it is properly located. THIS MAY REQUIRE 2 PEOPLE
TO COMPLETE.
Keg Joining Bracket
1/4 Barrel Keg
TU
RN
CL
OCK
WISE
PUSH DOWN
THEN
10
English