It shall use the vacuum pump of (lower than -755mmHg)high vacuum degree and large air
discharging (over 40l/min).
The vacuumizing time depends on the length of the connecting pipe, generally is 1~2 hours.
When vacuumizing, it shall be confirmed both gas and liquid side valves are closed.
If after 2 hours vacuumizing, it cannot reach the vacuum degree below -755mmHg, it can be
vacuumized for other 1 hour.
If after 3 hours vacuumizing, it still cannot reach the vacuum degree below -755mmHg, check
if there is any leaking point and repair the them.
From the first to third steps, if the pressure drops, check the leakage in each joint by the sense
of hearing, feeling or soap water, etc. to find the leaking point.
After confirming the leaking point, welding it again or tighten the nut tightly again.
Checking the leaking point
Use vacuum pump to perform vacuumizing. It is strictly forbidden to use the refrigerant to remove
the air inside the system.
After air tightness test and discharging all the nitrogen, connect the vacuum pump as the following
figure shown.
If after over 2 hours vacuumizing, the vacuum degree is below -755mmHg, close the VL and VH
on the meter separator and stop vacuumizing. 1 hour later to confirm if the vacuum degree changes.
If changes, it indicates there is leaking point in the system. Check the leaking point and repair.
After finishing the above vacuumizing, change the vacuum pump into refrigerant pump to charge the
refrigerant.
After pressurizing for 24 hours, each 1 C difference of ambient temperature will result in 0.01MPa
(0.1kg/cm2g) pressure change. It shall be corrected during test.
Piping and indoor unit vacuumizing
2-way valve totally closed
(Liquid side)
Indoor units
Indoor
Outdoor
Completely tightened
Completely tightened
Outdoor units
Vacuum pump
Discharging valve
3-way valve totally closed
(Gas side)
Low pressure gauge
High pressure gauge
Meter separator
V LVH
Flare part
Flare part
P
>a__WcU[S^ <[c >a`V[e[a`Wc
-106-
Содержание AB072XCBAA
Страница 21: ... a__WcU S c a V e a Wc AU84NXTBAA 66 33 1 23 4 43 33 61 2 3 160 2 15 3 52 21 ...
Страница 28: ... a__WcU S c a V e a Wc w y z x wt9 61 xt 98 96 816 yt5861 zt256 1 o MRWMHI p t9 61 2v xB r 2v xB r 2wzxB 28 ...
Страница 138: ... a__WcU S c a V e a Wc AU282XHBAA AU422XIBAA PCB printed diagram 138 ...
Страница 141: ... a__WcU S c a V e a Wc AU84NXTBAA PCB printed diagram 141 ...
Страница 144: ... a__WcU S c a V e a Wc AB AE AD units PCB printed diagram 144 ...
Страница 149: ... a__WcU S c a V e a Wc AF07 142XCBAA PCB printed diagram 149 ...
Страница 180: ...MEMO Commercial Air Conditioner ...