18
Installation and Maintenance Manual, Compact CBP
Installation
3.1.3b
Fitting the double ended torque arm
The torque arm is fitted to the motor before the
motor is mounted on to the driven shaft. See
.1.a "Fitting the torque arm to the motor".
Alt. 1:
Check and adjust the rod end (pos 1) according
to the drawing. Mount the rod to the torque arm,
use the shaft (pos ) and lock them with circlips.
Tighten the 4 pcs of screw (pos ) on the rod
end, Torque according to table .7b.
Mount the hydraulic cylinder. The piston rod
has to be mounted upwards, and on the right
hand viewed from the motors main connection
side. Cylinders oil connection A, B and C must
point in the direction to the motor. Mount the
hoses. The hose mounted to the high pressure
connection (C) has to be mounted to the
hydraulic cylinders connection B, and the hose
from connection (A) has to be mounted to the
cylinders connection A.
This is valid with the cylinder on the right side
hand-side of the the motor, and a single speed
motor.
Remark!
Start the system and run it for some minutes.
Vent the cylinder from air. Use the vent screws
on the cylinder (pos 4).
Fig. 3.9b
Table 3.7b
CBP 140
Cylinder
Screw
dimension
Tightening torque
Nm
lbf·ft
50/6
M8x5
5
15
80/56
M10x0
49
6
100/70
M1x40
86
6
15/90
M16x0
10
155
CBP 280-840
Cylinder
Screw
dimension
Tightening torque
Nm
lbf·ft
6/45
6/50
70/45
80/50
80/56
80/6
M10 x 0
49
6
Table 3.7c
A
C
2
3
1
4
A
B
C
Fig. 3.9c