2
11
Water Inlet Hose
2
10
Gravity Ball
1
9
Pull-Out Hose
1
8
Lock Screw
2
7
Lock Nut
1
6
SUS Gasket
1
5
Rubber Gasket
1
4
Rubber Gasket
1
3
Outlet Extension Pipe
1
2
O Ring
1
1
Body Group
1
NO.
NAME
QTY
1. Operation Notice
1.
Please clean the inner cavity of the water supply pipe before installing the faucet to
ensure there is no foreign matter in the pipe
2.
The installation table must be perforated according to the product requirements.
The diameter of the hole is recommended to be between 33 and 40;
3.
Working Condition Working Pressure 0.5-10 Bar (Including hot and cold pressure)
Applicable Water Temperature: 5
o
C-90
o
C
Ø
Ø
1
2
3
4
6
8
11
10
5
7
9
OPEN