
6-4
Link Assembly
P/N 108755-US, Manual revision: AA
L
INK
A
SSEMBLY
I
NSTALLATION
1.
With link to the front of Shaker, link D touching the workbench in front of
Shaker, place the link assembly on the threaded ends of the spring guide
shaft (see Figure 6-2, Link Assembly Removal and Installation). Replace
the lock washer and nut on right end shaft and lock washer, washers and
nut to the left of shaft. Do not tighten screws at this point.
2.
Ensuring that the torsion spring is in the groove of the torsion bushing, ro-
tate the shaft approximately ½ turn toward the neck or until the 832 shoul-
der screw on shaft is facing neck of Shaker. Tighten nuts on shaft.
3.
Grease shoulder bolt and apply red Loctite
®
271 to threads. Rotate the
link assembly back toward the neck until the shoulder bolt can be inserted
through the link M and crank M.
Note: Threads on the shoulder bolt are left-handed threads.
4.
Crank M and Link M should be close to parallel. If adjustment is needed,
remove left lockwasher and nut and remove or add washers as necessary.
Содержание SEBRA 1040
Страница 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Страница 3: ......
Страница 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Страница 8: ...vi Preface P N 108755 US Manual revision AA...
Страница 12: ...x Table of Contents P N 108755 US Manual revision AA...
Страница 14: ...xii List of Figures P N 108755 US Manual revision AA...
Страница 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Страница 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Страница 37: ...P N 108755 US Manual revision AA Chapter 4 Parts Access BASE PLATE REMOVAL 4 2 SHROUD REMOVAL 4 3...
Страница 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Страница 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Страница 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Страница 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Страница 83: ...P N 108755 US Manual revision AA Chapter 11 Clamp Body Boss Replacement REPLACING THE BODY BOSS 11 2...
Страница 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Страница 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Страница 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Страница 103: ...P N 108755 US Manual revision AA Chapter 15 Shaker Keystroke Quick Reference KEYSTROKE QUICK REFERENCE 15 2...
Страница 105: ......
Страница 106: ...Haemonetics Corporation 400 Wood Road Braintree MA 02184 USA www haemonetics com 1995 2010 Haemonetics Corporation...