5.52.541.01.01.09
21
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a
“qualified person” before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and
trolley movement, must be tested by a “licensed qualified person” before putting in operation.
An exception is “hoists ready for operation” acc. validated national regulations with EU-declaration of
conformity.
Definition “qualified person” (former expert)
A “qualified person” has learned, due to occupational training and experience and the job that the person has
done, the skills nee
ded to tests the material for one’s work.
Definition “licensed qualified person” (former approved expert)
A “licensed qualified person” has, due through special occupational training, knowledge about testing of the
material for one’s work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test the material for one’s work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
9.2
Compressed air connection
Before commencing work on the equipment, the main air supply line must be closed and secured against
inadvertent opening!
9.2.1
Main connection
The connections must be made according to the pneumatic connection diagram.
Connect to the existent hose nozzle.
The hose must be secured with a hose clamp.
Nominal width of the air connection hose
0,52-0,75 kW - NW 13 mm
1,5 kW - NW 19 mm
2,5 kW - NW 25 mm
If hose length exceeds 15 m, a larger cross section must be selected.
9.2.2
Control hose connection
Control switches with hoses are connected at the factory, unless otherwise agreed.
9.2.3
Maintenance unit
It is important that an automatic maintenance unit, consisting of oiler, filter ,water separator and air pressure
reducer is installed in the main air supply - if not assembled by the manufacturer this must be assembled by
the customer.
It serves for the necessary preparation of the operation air so that the pneumatic motor can work trouble-
free. Installation must be as close as possible to the motor; - in no cases should the distance to the motor
exceed 10 m.
Should higher pressure occur in the supply net, it will be reduced to the operating pressure of 6 bar by the
pressure reducing valve. The oiler enriches the air with oil. Setting of oil addition: approx. 2 drops of oil must
be added per minute.
NOTICE!
HADEF does not assume any responsibility for damage caused by non-observance of the instructions.
CAUTION!
Should the unit be assembled at the customer, the maintenance unit is supplied without oil.
Before putting the unit into operation, the main air supply line must be cleaned and the oiler of the
maintenance unit must be filled with oil. Should this not be done the unit may be severely damaged.