Inspections as above. Please observe the national rules and regulations and the instructions in this manual! 

 

 

 

NOTICE!

 

Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting un

it must be tested by a “qualified 

person” before putting into operation for the first time. 
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley 
movement, must be tested by a “licensed qualified person” before putting in operation. 
An  exception  is 

“hoists  ready  for  operation”  acc.  validated  national  regulations  with  EU-declaration  of 

conformity. 

Definition “qualified person” (former expert) 

A “qualified person” has learned, due to occupational training and experience and the job that the person has 
done, the skills needed to tests the materi

al for one’s work. 

Definition “licensed qualified person” (former approved expert) 

A “licensed qualified person” has, due through special occupational training, knowledge about testing of the 
material for one’s work and knows the national accident prevention regulations and other prescriptions and 
technical regulations. This person must test the material for one’s work regularly with regard to design and 
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS). 

 

Safety check 

 

 

Before putting into service initially or when putting back into service, it must be checked whether: 

  All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured. 

 

10 

Functional test 

 

 

10.1 

Checks before the initial start-up 

Trolley drive 

  The open-lying teeth of the trolley drive must be lubricated. 

Hand gear for hand geared trolley 

  Ensure correct fit of the hand chain; it must not be twisted and must hang freely. 

10.2 

Functional test 

Trolleys 

Carefully move the trolley to the end positions and check the positions of the end stops. 

 

 

11 

Maintenance 

 

 

11.1 

General 

All  monitoring,  servicing  and  maintenance  operations  are  to  ensure  correct  functioning  of  the  equipment; 
they must be effected with utmost care. 

  Only 

“qualified persons” may do this work. 

  Servicing and maintenance work must only be done when the hoist is not loaded. 

  Records must be kept of all test results and measures taken. 

 

11.2 

Monitoring 

The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift 
operation.  In  case  of  severe  operating  conditions  (e.g.  frequent  operation  with  full  load)  or  special 
environmental conditions (e.g., heat, dust, etc.), the intervals must be shortened correspondingly  

 

 

 

 

Содержание 32/20EX

Страница 1: ...2D Ex h IIIA T135 C Db II 2G Ex h IIB T3 Gb or II 2D Ex h IIIA T200 C Db DANGER Not to be used with IIC gases and IIB gases hydrogen sulphide and ethylene oxide and light metal and shock sensitive du...

Страница 2: ...Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures 5 2 6 Explosio...

Страница 3: ...damage immediately to the forwarding agent This manual serves for safe and efficient use of this hoist Illustrations serve to explain something and may differ from the illustration of the existing un...

Страница 4: ...uipment i e regarding organization of work work flow and human resources In particular the owner user must ensure that The unit is only used appropriately The device is only operated in a fault free f...

Страница 5: ...21 Devices of this category have been specially modified and labeled by the manufacturer DANGER The permissible ambient temperature must not be exceeded Moving horizontally on beams DANGER The use is...

Страница 6: ...ide and light metal and shock sensitive dusts No use in temperature class T5 or T6 It is not allowed to use the equipment in area at risk from explosion where gas AND dust does both exist at the same...

Страница 7: ...ding e g c construction safety k encapsulation of liquids IIB explosion group II gases IIA IIB IIC limit gap widths MESG 0 9 mm limit gap widths MESG 0 9 to 0 5 mm limit gap widths MESG 0 5 mm T4 Temp...

Страница 8: ...ixtures for T5 do not occur with normal use and only very rarely occur for T6 for specific gas air mixtures such as carbon disulphide IIC our hoists are not rated for these temperature classes and mus...

Страница 9: ...5 52 693 01 01 00 9 2 6 4 Explosion hazards recognizing and preventing 3 Transport and Storage...

Страница 10: ...GER Units that show corrosion must be taken out of service 4 Description 4 1 Areas of application The devices must be as far as possible installed in a covered room If they are used in the open protec...

Страница 11: ...all standard beams with inclined and parallel flanges Side plates Made of steel plate with integrated wheel fracture supports load bars Device with 2 load bolts Different bolt lengths are available f...

Страница 12: ...e inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs depended on type leave a distance for the load hook It is important that the load hangs in the middl...

Страница 13: ...mm 1 1 5 mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operation o...

Страница 14: ...regard to design and kind of use The license will be given to qualified person be the approved supervision authorities Z S 9 Safety check Before putting into service initially or when putting back in...

Страница 15: ...BER Renolit FEP 2 Alvania EP 2 Unirex EP 2 Mobilux EP 2 MULTIS EP2 Stabylan 5006 Optimol Viscoleb 1500 Kl beroil 4UH 1 1500 Wolfracoat 99113 Chain lubricant OKS 451 13 2 Lubricant for food industry S...

Страница 16: ...datory that all steps for decommissioning the machine are carried out in the indicated sequence First secure the working area for decommissioning leaving plenty of space Read the chapter Safety instru...

Отзывы: