5.52.208.01.01.02
17
12.2
Wire rope
Adequate performance of the servicing and monitoring work acc. to the validated, national regulations
“Basics for cable drives – monitoring during use”.
A visual check must be effected before every new work shift.
Wear
Deformation
Fissures
Corrosion
Report any damage immediately to the responsible person and exchange damaged or worn wire ropes and
load tackles.
12.3
Inspection intervals
bei
Inbetriebnahme
daily
Prüfungen
1st maintenance
after
3 months
Prüfung, Wartung
alle
3 months
inspection,
maintenance
every
12 months
inspection of the equipment by an expert
(periodic inspection)
X
Schraubenverbindungen prüfen
X
X
check brake function
X
X
clean and lubricate the wire rope
X
X
X
check wirerope and wirerope fastenings
for damage and wear
X
Load taking devices and load hook -
Check for fissures and deformation
X
13
Service
13.1
Wire rope
Wire ropes have to be exchanged by new, original wire ropes if they show corrosion, fracture or if they are
worn.
Checks:
Fastening screws must be checked before commissioning and at least every 3 months, - tighten them if
necessary.
Kind and number of broken threads.
Position of the broken threads
Timing sequence of occurrence of breaks.
Reduction of the wire rope diameter.
Corrosion
Abrasion
Deformation
Heat influence
Operation time
Wire rope fastening
CAUTION!
The wire rope must be replaced immediately should even one strand be broken.
13.2
Gear
quarterly: lubricate the worm gear wheel and the worm gear shaft
Recommended lubricant: grease, FUCHS Renolit FEP 2, or similar
13.3
Gear spring pressure brake
During the check, brake lining wear is verified. The brake linings must be replaced when the wear limit is
already reached at one position of the lining, - as this can be the case when wear of the linings is irregular.