Figure 2 Product components
1
SP-510 Hardness Monitor
5
Indicator solution
2
Installation kit
1
6
Magnesium sulfate solution
3
Maintenance kit
2
7
TitraVer
®
(EDTA) hardness titrant
4
Buffer solution
Installation
D A N G E R
Electrocution hazard. Always remove power to the instrument before making electrical connections.
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
Install the instrument
Install this instrument on an indoor wall, away from direct sunlight.
• For a complete purge of the sample line during each cycle, install the instrument as close to the
sample point as possible.
• Leave sufficient clearance at the bottom and sides for tubing and cable connections.
Refer to
1
Refer to the installation kit documentation for more information.
2
Refer to the maintenance kit documentation for more information.