77
Maintenance
Figure 20
CPU Board
9.4.1 Fuse Removal and Inspection
To remove a fuse, pull it straight out of the clips that hold it in place. Usually a close look
will tell you if a fuse is blown. The wire strand inside the glass tube will be broken.
Occasionally it may take an ohmmeter to verify if a fuse is good or not. You may need to
remove plug J1 to access fuse F1.
Always replace any fuse with the exact same size and type rating. Over-rating or
bypassing a fuse could lead to severely damaged equipment.
Table 32 CPU Board Fuse
ID
Description
Type & Rating
F1
RS485 Interface Connector
2 Amp, 250 V ac Fast-blow, 5 x 20 mm (P/N 2605)
Table 33 CPU Board Connectors
ID
Description
J1
Liquid Crystal Display (LCD) Board
J2
Mechanical Totalizer
J3
not used
J4
Base Board
J5
Memory Backup Battery Pack
J6
RS232 Serial Port
J7
RS-485 - Submerged Pressure Probe - (not used on bubbler 950)
J8
Modem Option Module
J9
Liquid Crystal Display (LED back-light)
J10
Keypad
J11
not used
J6
J10
J9
J4
J11
J5
J2
J8
J7
F1
J1
Содержание Sigma 950
Страница 2: ......
Страница 6: ...4...
Страница 20: ...18 Introduction...
Страница 34: ...32 Basic Programming Setup...
Страница 50: ...48 Sensor Installation...
Страница 82: ...80 Maintenance...
Страница 83: ...81 Appendix A Program Flow Charts Figure 22 Overview of Basic Program Menus...
Страница 84: ...82 Program Flow Charts Figure 23 Setup Flow Chart...
Страница 85: ...83 Program Flow Charts Figure 24 Options Flow Chart...
Страница 86: ...84 Program Flow Charts Figure 25 Alarms Menus Flow Chart...
Страница 87: ...85 Program Flow Charts Figure 26 Calibration Menus Flow Chart Page 1...
Страница 88: ...86 Program Flow Charts...
Страница 102: ...100 Programming Features...
Страница 106: ...104 Primary Devices Head Measurement Locations...
Страница 126: ...124 SCADA Modbus System Guidelines...