64
Figure 18
Controller Circuit Board
5.6.1
Wire Preparation
Because low voltages (voltages <30Vrms) and primary voltage (115/230 Vac) are not
separable within the controller enclosure, it is necessary that all customer wiring be 300V
or more to assure adequate levels of insulation protection of low voltage wires from high
voltage circuits. Additionally, the recommended cable for signal wires (electrode,
recorder, controller, and SIO) is 22 AWG twisted pair shielded cable, which assures
compliance with RF immunity and emissions standards.
The alarm cable can be unshielded cable sized according to the load being used. Prepare
the cables as follows: Strip the outer jacket back 7 inches. Cut the shield wire to a length of
3 inches.
Содержание EC1000
Страница 2: ...2...
Страница 8: ...8...
Страница 12: ...12...
Страница 14: ...14...
Страница 16: ...16...
Страница 18: ...18 Figure 1 Controller Front Panel...
Страница 20: ...20 Figure 2 Pump Module...
Страница 24: ...24 Figure 6 pH Control Loop...
Страница 54: ...54...
Страница 56: ...56...
Страница 58: ...58 Figure 12 Controller Installation Panel Mount...
Страница 61: ...61 Figure 15 Installing the pH ORP Electrode Figure 16 Flow Thru Cell...
Страница 70: ...70...
Страница 73: ...73 6 4 Calibration See Section 2 3 Calibration Figure 21 Priming Tee Operation...
Страница 74: ...74...
Страница 80: ...80...
Страница 83: ...83 Figure 24 Sensor Replacement...
Страница 85: ...85 Figure 25 Hach One pH Process Electrode...
Страница 89: ...89 Figure 26 Pump Module Plumbing Diagram...
Страница 102: ...102...
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 108: ...108...
Страница 112: ...112...
Страница 116: ...116...
Страница 122: ...122...
Страница 123: ...123...
Страница 124: ......