Page 11
16116Install.fm
Installation
Section 2
Installation
2.1 Overview
Installation of the residual chlorine monitor consists of mounting and wiring
the monitor, pipe-mounting the probe (for submersion applications), and
connecting sample and drain lines for applications requiring flow cell usage.
Connect the probe to the electronics module by plugging the probe multi-pin
plug into the receptacle at the bottom of the electronic module.
2.2 Monitor Mounting
The programmable electronic monitor is enclosed in a NEMA-4X enclosure
that can be mounted to a wall, through a panel, or onto a handrail or pole.
2.2.1 Wall Mounting
Two mounting brackets (one on each side) are attached to the monitor with
four screws (supplied). With the bracket tabs and mounting holes extending
beyond the monitor on each side, the monitor can be attached to a wall or flat
surface using four [need size] screws and appropriate mounting hardware.
Figure 2
Monitor with Wall Mount Brackets
Figure 3
Wall Mount Brackets (Rear View)
9.75" (24.8 cm)
8.75" (22.2 cm) c-c
8.4" (21.3 cm)
4" (10.1 cm)
4.875" (12.4 cm)
6.4" (16.2 cm)
RESIDUAL CHLORINE MONITOR
Содержание 8450
Страница 2: ...Visit http www hach com ...
Страница 8: ...Visit http www hach com ...
Страница 50: ...Page 50 SYS Menu 16116Operation fm Section 3 ...
Страница 62: ...Visit http www hach com ...
Страница 66: ......