![Habegger HIT Series Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/habegger/hit-series/hit-series_operating-manual_576028017.webp)
Betriebs- & Wartungsanleitung
TS. 02.06.2020
Technik
Seite 17 von 26
©Copyright by Habegger Maschinenfabrik AG
Version 04 / 02.06.2020
4.1.6
Inserting rope
-
Swivel both actuation levers toward the rope intake
side.
-
Press the clamping jaw opening lever (A) to the mid-
dle of the hoist device, Image 7 (1) and lock it in the
upper position.
-
Hold the level tightly to prevent it from unintention-
ally snapping back.
-
Straighten the end of the rope (2) with the end ap-
prox. 200 mm long.
-
Insert the end of the rope into the rope guide and
push the rope in until it protrudes from the other
side. Guide the rope through above the anchor bolt
(as shown on the type plate).
-
Pull the end of the rope (3) through the device until
the rope is in the desired position.
-
Take the clamping jaw opening lever (A) out of the
locked position, Image 7 (4). Hold the level tightly to
prevent it from unintentionally snapping back.
4.2
Working
4.2.1
Pulling, lifting and lowering
-
Place the lever pipe on the forward gear lever (B) on
the hoist device and secure it by turning it in any di-
rection, Image 8, right.
-
Move the rope forward by moving the lever back
and forth with long, even movements.
-
To lower it, place the lever pipe on the reverse gear
lever (C) on the hoist device and secure it by turning
it in any direction, Image 8.
-
Move the rope backward by moving the lever back
and forth with long, even movements.