2-2
Installation flowchart
Figure2-1 Installation flowchart
Start
Install the AP
Connect the power cord
Label cables
Verify the installation
Power on the AP
Operating correctly?
Power off the AP
Troubleshoot the AP
End
Yes
No
Connect cables (Ethernet
cable, fiber cable, and
feeder line)
Ground the AP
Mount the AP in a PDC
Yes
No
Attach the AP bracket
Mount the AP on a
wall
Mount the AP on a
horizontal pole
Mount the AP on a
vertical pole
(Optional) Adjust the AP
angle