H3C S6850-56HF Скачать руководство пользователя страница 1

2

Installation aCcessories

Wear an ESD wrist strap, and make sure the wrist strap makes good skin contact and is reliably grounded.

操作者需佩戴防静电腕带,确保防静电腕带与皮肤良好接触,并确认防静电腕带已经良好接地。

No installation tools are provided with the switch. Prepare them yourself as required.

交换机不随机提供安装工具,请用户根据实际安装需求自己准备安装工具。

Phillips screwdriver

十字螺丝刀

ESD wrist strap

防静电腕带

Tool list

!

Marker

记号笔

Grounding cable and 

grounding screw

接地线和接地螺钉

M4 screw

M4

螺钉

M6 screw and cage nut 

(user supplied)

M6 

螺钉和浮动螺母(用户自备)

Attaching the accessories to the switch 

For LS-6850-56HF, LS-6850-56HF-H1 and S6850-56HF-SAN switches,If the rack depth is in the range 
of 692 to 853 mm (27.24 to 33.58 in), use the short chassis rails and long slide rails provided with the 
switch for installation.For LS-6850-56HF-H3 ,If the rack depth is in the range of 634 to 792 mm (24.96
to 31.22 in), use the short chassis rails and long slide rails provided with the switch for installation.

Installing the mounting brackets and long slide rails 

Mounting brackets installed Near the port side 

挂耳安装到靠近端口侧

Mounting brackets installed Near the power module side 

挂耳安装到靠近电源侧

c

1

Install the chassis rails at a or b. 

挂耳安装在靠近端口侧时,滑道导轨可安装在

a

b

任意一处。

Install the chassis rails at c or d. 

挂耳安装在靠近电源侧时,滑道导轨可安装在

c

d

任意一处。

H3C S6850-56HF & S6850-56HF-SAN Switches Installation Quick Start-6W104
H3C S6850-56HF & S6850-56HF-SAN

-6W104

Connect a grounding cable with 

a single-hole lug

安装单孔接地端子地线

Connect a grounding cable with 

a dual-hole lug

安装双孔接地端子地线

1

对于

LS-6850-56HF, LS-6850-56HF-H1 and S6850-56HF-SAN

交换机,如果机柜前后方孔条间距在

692

853mm

范围内,请使用标配的长滑道短导轨配合安装。对于

LS-6850-56HF-H3

交换机,如果机柜

前后方孔条间距在

634

793mm

范围内,请使用标配的长滑道短导轨配合安装。

For device stability, make sure the slide rails reach a minimum of 20 mm (0.79 in) out of chassis rails.

为保证设备安装后的稳定性,当滑道与滑道导轨安装完成后,请确保滑道的头部露出滑道导轨的最小长
度为

20mm

The device uses M5 grounding screws. You can use a grounding cable with a single-hole or dual-hole 
grounding lug to ground the device. If the grounding cable or grounding lug you receive does not meet the 
requirement, you can make a grounding cable on site or contact H3C Technical Support.

设备侧接地点支持单孔端子和双孔端子的接地电缆安装,接地螺钉为

M5

螺钉。如果您收到设备的接地电

缆长度或者端子类型不满足要求,可以现场制作合适的线缆解决或者联系

H3C

技术支持解决。

Connect a grounding cable 

with a single-hole lug

安装单孔接地端子地线

Connect a grounding cable 
with a dual-hole lug

安装双孔接地端子地线

a

a

b

c

d

Removable cable tie

可拆卸式扎带

Long chassis rail and  super-

short slide rail (optional)

超短滑道和长导轨(选配)

Mounting bracket(the marked round hole, if 

any, supports hanging an asset tag)

挂耳(带圆孔的版本支持悬挂固定资产牌)

Short chassis rail and 

long slide rail

长滑道和短导轨

The device provides multiple installation positions for chassis rails on two sides. Determine the
installation position for the chassis rails based on the rack depth. 

设备侧面板提供了多个滑道导轨安

装位,用户可根据机柜的深度,调整滑道导轨的安装位置。

The installation positions of the accessories in the following figure are for illustration only. 
Determine installation positions for the accessories based on The installation requirement.

以下图中附件的安装位置仅供参考,请根据实际安装场景的需要选择合适的安装位置。

Power module 

filler panel A

电源假面板

A

Power module 

filler panel B

电源假面板

B

Отзывы: