Tool list
Mounting the switch to a rack
Introduction to installation accessories
Before installation, wear an ESD-preventive wrist strap, and make sure that the wrist strap
has a good skin contact and is well grounded.
When the depth of a switch is greater than 300 mm (11.81 in), the front mounting
brackets only secure the switch rather than bear its weight.
Flathead
screwdriver
Phillips
screwdriver
ESD-preventive wrist
strap
Needle-nose
pliers
Wire-stripping
pliers
Diagonal
pliers
Blow dryer
Grounding cable
Front mounting bracket
and M4 screws
Cage nut (User supplied)
Rear mounting bracket
and load-bearing screw
Rubber pads
M6 screw (User supplied)
Bail latch
The installation tools are not provided with the switch. Prepare them by yourself.
Method 1—Using only front mounting brackets
Install front
mounting brackets
Install cage nuts to the
square holes of the rack
1U
2
3
1
Method 2—Using front and rear mounting brackets
1U
Install the load-
bearing screw
Install the front mounting
bracket
Install cage nuts to the
square holes of the rack
Mount the rear mounting
brackets to the square holes on
the rear post of the rack
4
3
1
2
Mounting the switch to a workbench
2
Stick the rubber pads to the appropriate
positions on the switch bottom
1
Connecting the grounding cable