6
Figure 2
Airflow through the S12516-X AC/S12516-X DC chassis
(1) Power module air inlet vents
(2) Power module air outlet vents
(3) Chassis air inlet vents
(4) Chassis air outlet vents
Space
For easy installation and maintenance, follow these space requirements:
•
Reserve a minimum of 1.2 m (3.94 ft) of clearance between the rack and walls or other devices.
•
Make sure the rack has enough space to accommodate the switch. See
for rack
requirements. For more information about chassis dimensions, see "
Содержание S12500-X
Страница 35: ...26 Figure 20 Grounding the switch through the RTN wire of the DC power module...
Страница 80: ...71 Figure 51 Replacing an LPU 1 1 Loosen the captive screw 2 Pull the ejector levers outward...
Страница 138: ...129 Figure 75 CXP fiber cable 1 Connector 2 Pull latch 1 2...
Страница 152: ...143 Figure 91 Cable routing from the left side for an S12510 X AC S12510 X DC switch...