![H3C S10506 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/h3c/s10506/s10506_installation-quick-start_4421572010.webp)
7
2.
Install the cage nuts in the marked square holes on the rack posts.
Installing the switch in the rack
Follow these guidelines when you install the switch in the rack:
•
To avoid equipment damage or bodily injury, use a minimum of two people to lift the switch. H3C
recommends that you use a mechanical lift to move the switch.
•
Do not hold the filler panels, filler panel handles, or the air vents of chassis to carry the chassis. Any
attempt to carry the switch with these parts might cause equipment damage or even bodily injury.
•
After placing the switch on the slide rails, do not leave go of your hands immediately because this
might tip the switch. Tipping the switch can cause switch damage and even bodily injury.
Figure 9
Installing the switch in the rack
Grounding the switch
CAUTION:
•
Use the provided grounding cable (yellow-green grounding cable).
•
Connect the grounding cable to the grounding system in the equipment room. Do not connect it to a fire
main or lightning rod.