2-8
Figure2-9 Grounding the router through the grounding point on the chassis
Installing routing and switching units
The routing and switching units (RSUs) are hot swappable.
To install an RSU:
1.
Wear an ESD wrist strap. Make sure the wrist strap makes good skin contact and is reliably
grounded.
2.
Remove the filler panel (if any) from the target slot.
Figure2-10 Removing the filler panel
3.
Pressing the locking tab on each ejector lever, simultaneously open the two ejector levers fully.
4.
Slide the RSU slowly along the guide rails into the slot until the RSU seats in the slot.
5.
Close the ejector levers. Make sure they are firmly against the front panel of the RSU.
6.
Use a Phillips screwdriver to fasten the captive screws on the RSU.