![H3C F5000-AI160 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/h3c/f5000-ai160/f5000-ai160_manual_3116420008.webp)
6
Installation accessories
Table1-5 Installation accessories
M6 screw
Cage nut
Front mounting bracket
and M4 mounting screw
Rear mounting bracket
and M4 shoulder screw
Rubber feet
Console cable
Grounding cable
Pre-installation checklist
Table1-6 Checklist before installation
Item
Requirements
Result
Installation
site
Ventilation
•
Ensure a minimum clearance of 100 mm (3.94 in)
around the air inlet and outlet vents of the chassis.
•
If you install the firewall in a standard 19-inch rack,
ensure a distance of 1U (44.45 mm, or 1.75 in)
between the chassis and other devices.
•
A good ventilation system is available at the
installation site.
Temperature
•
Operating: 0°C to 45°C (32°F to 113°F)
•
Storage: –40°C to +70°C (–40°F to +158°F)
Relative humidity
•
Operating: 5% RH to 95% RH, noncondensing
•
Storage: 5% RH to 95% RH, noncondensing
Cleanness
•
Dust concentration ≤ 3 × 10
4
particles/m
3
•
No dust on desk within three days
ESD prevention
•
The equipment, workbench, and rack are reliably
grounded.
•
The equipment room is dust-proof.
•
The humidity and temperature are at an acceptable
level.
•
Wear an ESD wrist strap and make sure it makes
good skin contact and is reliably grounded when
installing removable components.
•
Put the removed interface modules away on an ESD
workbench, with the PCB upward, or put them in ESD
bags for future use.
•
Touch only the edges, instead of electronic
components when observing or moving a removed
interface module.
EMI prevention
•
Take effective measures to protect the power system
from the power grid system.