1-13
Figure1-8 Installation tools
Pre-installation checklist
Table1-7 Pre-installation checklist
Item
Requirements
Result
Installation site
Load bearing
•
The floor or ground at the installation site can
support the combined weight of the router and the
rack.
•
The slide rails can support the actual weight of the
router.
Space
•
There is a minimum clear height of 3 m (9.84 ft)
(from the beam or the air duct to the floor) in the
equipment room.
•
There is a minimum clearance of 1200 mm (47.24
in) between the rack and walls or other devices
Rack
•
The rack has a good ventilation system.
•
The rack is sturdy enough to support the weight of
the router and its installation accessories.
•
The rack has a size that can accommodate the
router.
•
The front and rear of the rack are a minimum of
1200 mm (47.24 in) away from walls or other
devices.
Ventilation
•
The air inlet and outlet vents of the router are not
blocked and adequate clearance is reserved
Содержание CR19000-8
Страница 10: ...1 4 Figure1 1 Chassis dimensions Figure1 2 Rack requirements ...
Страница 41: ...3 6 Figure3 6 Connecting an AC power cord ...
Страница 52: ...4 10 Figure4 12 Installing an interface subcard ...
Страница 115: ...12 7 Figure12 5 Putting the foam cusion and carton top cover in place ...