ASSEMBLY INSTRUCTIONS
WTPSS41CE PRESENTATION STATION
Figure 1
PARTS LIST:
1. (8) Grooved Legs
2. (2) Perforated Back Panels
3. (1) Right Side Cabinet Door Panel
4. (1) Swing Down Cabinet Door (upper)
5. (4) Casters
6. (1) Upper Right Panel
6. (2) Left Perforated Side Panels
Place the four fluted legs over the corner posts (bosses) of the bottom shelf so that
the channels face each other. Use a rubber mallet to tap legs into place. Make sure
that legs are even and fully seated. (FIGURE 1)
LOWER CABINET- Locate back & front ventilated panels (ventilation holes, are 24"W
and do not have doors) and slide down into grooves of the 2 back legs. Slide other
one into the front grooves. Slide lower left side panel into left front & back leg
grooves. Slide Right Cabinet Door into grooves on opposite side.
Take middle shelf and place onto legs so that the bosses are fitting into the holes in
the top of the legs. Be sure that the ribbed side is facing down. Push shelf down as
far as you can by hand. Gently tap with mallet if necessary.
shows how to insert panel
into channel. Upper right
panel shown.
8. (1) Right Side Cabinet Door Panel (lower)
9. (1) LCD Projector Shelf Assembly
10. (1) Perforated Lower Front Panel
11. (1) Electrical Assembly with Hardware
12.
(1) EACH top shelf (handle), middle shelf (8 bosses) & bottom shelf (4 bosses)
H. Wilson Company
555 West Taft Drive
South Holland IL 60473
Phone: (800) 245-7224
***READ INSTRUCTIONS BEFORE BEGINNING ASSEMBLY
***BACK & FRONT OF SHELVES ARE 24"W, SIDES ARE 18"W
Tools Required: Rubber Mallet Phillips Head Screwdriver