background image

 

 

PEL-3000 Series Parallel Assembly Guide 

13 

The 2nd Booster current checkup: 

I.

 

Connect the parallel cable to the J2 connector in the rear of 
PEL-3111 in one end and the J1 connector in the rear of PEL-3211 
in the other end. 

II.

 

Power on both PEL-3111 and the 2nd PEL-3211, while keep the 
rest units power-off. Set the unit PEL-3111 as the parallel mode. 
The setting procedure is identical to the setting of the 1st 
PEL-3211 validation. 

III.

 

Based on the connection method in the figure below, connect 
current sink cable to the unit followed by setting current sink 
value for unit. Measure the currents from both the current sink 
cable of Master positive pole and the current sink cable of Booster 
positive pole, via current probe, to validate the accuracy of 
currents. The measured current value of Master is supposed to be 
1/3 of the set value, whereas the measured current value of 
Booster should be 2/3 of the set value. 

 

Follow the previous steps to validate the 3rd and the 4th Booster 
respectively. 

The assembly procedure and system setting are completely finished. 
Press 

Main

 to return back to the main screen and the current sink test 

is properly ready to initiate. 

Содержание 01EL311100GT

Страница 1: ...PEL 3000 ...

Страница 2: ......

Страница 3: ... Quantity Description PEL 005 11EL 00500101 1 Bus Bar Connector PEL 006 11EL 00600101 1 Bus Bar Connector Included PEL 005 PEL 007 11EL 00700101 1 Bus Bar Connector Included PEL 005 PEL 008 11EL 00800101 1 Bus Bar Connector Included PEL 005 PEL 009 11EL 00900101 1 Bus Bar Connector Included PEL 005 GRA 413 E 01RA4130000GT 4 PEL 3111 3U Frame Optional GRA 414 E 01RA414E000GT 1 PEL 3111 3U Frame Opt...

Страница 4: ...PEL 3000 Series Parallel Assembly Guide 2 Put the 1st PEL 3211 on the bottom of the rack followed by fastening the 4 screws for side bracket in the front but not tightening them completely ...

Страница 5: ...d Put the 2nd PEL 3211 onto the L shape brackets within the rack and again fasten the 4 screws for side bracket in the front but not tighten them fully followed by screwing another group of L shape brackets within the interior of rack 2nd unit installation completion L shape bracket The L shape brackets screwed on the interior side of rack Approx 1mm between bracket and the top of unit ...

Страница 6: ...e 4 Repeat the previous steps in order to install the rest of PEL 3211s and further install the bracket GRA 414 3 of PEL 3111 on the upper side followed by installing the PEL 3111 onto the top of the bracket Assembly completion for 5 units ...

Страница 7: ...each unit as the figure below shown L type copper stick assembly L type copper sticks assembly completion In accordance with the figure below assemble the copper sticks for unit conjunction followed by fastening the screws in the front of rack tightly Copper sticks assembly diagram Diagram of rear side for copper sticks assembly ...

Страница 8: ...PEL 3000 Series Parallel Assembly Guide 6 ...

Страница 9: ... the parallel cables in accord with the following figure The last cable connecting to the last unit cannot be clipped with core When only one PEL 3111 connects to a PEL 3211 Booster in parallel the cable in the Booster end cannot be clipped with core ...

Страница 10: ...e rear side individually followed by powering on the power switch that is underneath the power socket indicates power ON Attentively check if the indicator in the front panel of all units lights up with red color I Master indicator lights up as the figure below II Booster indicator lights up as the figure below STBY indicator lights up ...

Страница 11: ...r lights up in green as figure below shown Press Main Configure F5 Next Manu F4 in the front panel followed by selecting 4 for Booster number within Configure page which indicates 4 Booster units in parallel See the steps figures below Select Booster number corresponding to the actual Booster number in parallel ...

Страница 12: ...llel Assembly Guide 10 Properly confirm if the indicator in the front panel of all PEL 3211 Booster lights up with LINK in green which means the software setting connects to Booster appropriately Refer to the figure below ...

Страница 13: ...by 20A individually First dismantle all of the positive parallel copper sticks and parallel cables in the rear output terminal of unit Check the 1st Booster current I Connect the parallel cable to the J2 connector in the rear of PEL 3111 in one end and the J1 connector in the rear of PEL 3211 in the other end II Power on both PEL 3111 and the 1st PEL 3211 while keep the rest units power off Set th...

Страница 14: ...ent sink value for unit Measure the currents from both the current sink cable of Master positive pole and the current sink cable of Booster positive pole via current probe to validate the accuracy of currents The measured current value of Master is supposed to be 1 3 of the set value whereas the measured current value of Booster should be 2 3 of the set value ...

Страница 15: ... below connect current sink cable to the unit followed by setting current sink value for unit Measure the currents from both the current sink cable of Master positive pole and the current sink cable of Booster positive pole via current probe to validate the accuracy of currents The measured current value of Master is supposed to be 1 3 of the set value whereas the measured current value of Booster...

Отзывы: