![Guyson Euroblast PF Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/guyson/euroblast-pf/euroblast-pf_operating-and-maintenance-instructions_2279332020.webp)
Operation &
Maintenance
Manual
Issue: 09
A6ML0165 - Euroblast PF Manual
Date: 05/2019
Page: 20
4.2 Media levels
The media should be added to the pressure pot either via the 75/16 cyclones upper door or the
CY600 cyclones filler chute. ¼ - ¾ of a 25kg bag of media should suffice.
NOTE:
If a HE cyclone is fitted, media should be added to the cabinet hopper.
4.2.1 Adding media to 75/16 cyclone
•
Turn off the dust collector
•
Turn off the cyclone
•
Open the upper cyclone door
•
Pour media into the cyclone
•
Close the door
•
Turn the dust collector on
•
Turn the cyclone on
The upper door should always be used so the media
can pass through the sieve before it gets to the mixer
box.
4.2.2 Adding media to CY600 cyclone
•
Turn off the dust collector
•
Turn off the cyclone
•
Open the filler chute flap
•
Pour media into the cyclone
•
Close the filler chute flap
•
Turn the dust collector on
•
Turn the cyclone on
Содержание Euroblast PF
Страница 66: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 66 10 Appendices...
Страница 80: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 80...
Страница 81: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 81...
Страница 82: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 82...
Страница 83: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 83 Wiring diagram...
Страница 84: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 84 General arrangement...