Guardian Type 508 Скачать руководство пользователя страница 1

Type 508

ISSUE 1

Downloaded from:

 http://www.guardianalarms.net

Содержание Type 508

Страница 1: ...Type 508 ISSUE 1 Downloaded from http www guardianalarms net ...

Страница 2: ...nut Locking nut Rotate 180 The type 508 housing comes packed in the orientation shown in fig 1 To bring the 508 into operational service follow the following procedure 1 Using the spanner supplied loosen the locking nut 2 Rotate the extruded bracket arm and cast base through 180 3 Retighten the locking nut ensuring the extruded bracket arm is in the desired position fig2 The 508 housing is now rea...

Страница 3: ...nd List of contents 508 operation manual Sheet 2 Before installation please remove the components from the packaging and check that all items listed below have been supplied Component Spares Heater 240V Heater 110V Heater 24V Heater 12V Thermostat Window Front Gasket Rear Gasket Fuse 1 Amp Sealing Plug Cable Gland Gland Nut Gland Washer C590 C622 C623 C624 H12a H146 A84 A85 C15 Z20 H66 H67 H66a 1 ...

Страница 4: ...eet 3 Circuit Diagram Unit fitted with a 20 x 5mm 1 Amp fuse as standard It is the customers responsibility to change the fuse to suit their own application Cover Earth TB1 PLATFORM FTB FS1 L E N Chassis Earth PCB1 PTC Spare ...

Страница 5: ...ook 3 Let the body sunsheild hang from the hook With the body hanging from the hook any maintenance inspection of the camera and wiring can be acheived in situ Replacing the body is the reverse procedure To remove the Body and sunsheild from the platform completely unscrew the 2 off M3 nuts from the suspension bracket whilst the body is in the hanging position Operation 1 2 3 Body Suspension Brack...

Страница 6: ...en firmly to convert the housing from wall mounted to ceiling mounted orientation Remove 2 off fixings item1 rotate bracket arm item2 through 180 and refit item 1 Loosen locking nut item 3 position the housing to the desired orientation and re lock For additional security 2 x M6 grub screws are provided To gain access to these grub screws gently prise out the two plastic stop plugs Then using the ...

Страница 7: ...e 260 useable internal length 551 Poly carbonate Window 10mm Thick Hidden Cable Bracket Wall Mounted Orientation 90 tilt down 90 Pan Customer Cable Run Locking Nuts 91 175 Fused Mains Terminal Block and 6 way terminal block Hidden Cable Bracket Ceiling Mounted Orientation 90 tilt down 90 Pan 222 146 84 Max 90 Pan A 4 off mounting holes Ø7 5 equi spaced on a 101 6 508 Housing Outline One 3 Way Fuse...

Страница 8: ...al Sheet 7 Customer Electrical Connections 6 7 9 8 1 10 4 3 2 5 1 2 3 4 5 6 7 8 9 10 Platform Gasket Housing Back Plate 423 Bracket Assembly Cable Run Locking Nut Rubber Diaphragm Housing Wiring Layout Arrow B Components ...

Страница 9: ...508 operation manual Sheet 8 View on Rear T B s Arrow B Customer Electrical Connections Ref L E N 1 2 3 4 5 6 Function Line Earth Neutral Spare Spare Spare Spare Spare Spare 1 to 6 L E N From Heater ...

Отзывы: