Guardian Telecom
Installation and Operation
DTR/DTT-VoIP Series Telephones
Page 15
9.4. Network Connectivity, and Data Rate
When you plug in the Ethernet cable or power supply:
• The square, green
Link
light above the Ethernet port indicates that the network connection has been
established (see Figure 9). The Link light changes color to confirm the auto-negotiated baud rate:
• This light is yellow at 9 Mbps.
• It is orange at 100 Mbps.
9.4.1.
Verify Network Activity
The square, yellow
Activity
light blinks when there is network activity.
Figure 9 - Network Activity