Sy
nch
ro
no
us g
en
er
at
or
s o
f s
er
ie
s D
G
G
, D
W
G a
nd W
G
Issue 05/2013
Page 34
Installation of generator
Permissible installation positions
6.4.2
Dual-bearing generators (BG 132 an BG 160)
>
Install the generator on a horizontal surface,
standing on the attachment brackets.
Ö
adjacent figures
y
In the normal installation position, the
terminal box (or depending version, the cable
outlet or switch box) is positioned on the top
side of the generator.
y
The generator can be installed rotated by
45° or 90° to the left or right, as shown in the
accompanying image. Remove the attachment
bracket and install in the corresponding
mounting profiles.
>
Replace the screws with screws of the same
grade.
Replacement screws of the same grade are
supplied by GTS.
>
The screws must be tightened to the correct
torque.
y
Torque 25 Nm for grade 8.8
y
Torque 35 Nm for grade 10.9
Other installation positions are not permitted.
no
no
no
ok
ok
ok
Содержание BG 132
Страница 118: ...page 118...
Страница 119: ...page 119...
Страница 120: ...page 120...
Страница 121: ...page 121...
Страница 123: ...Page 123 Issue 05 2013...
Страница 126: ...Synchronous generators of series DGG DWG and WG Issue 05 2013 Page 126...
Страница 127: ...Page 127 Issue 05 2013...