Страница 1: ......
Страница 2: ...16 NUTS M22 TBWA22 16 WASHERS M22 TBSW22 16 SPRING WASHERS M22 8 PCUB12 6 SET U BOLTS M12 Stainless Steel post cap assembly BASE 9 MPP 3 SET MAIN POST PLATE 300 X 300 Galvanized Steel 10 L B78 12 L A...
Страница 3: ...2 Abrasion condition of rope Checking of all rope surface Strengthned of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galv...
Страница 4: ...UV guard and the landing surface is textile reinforced flexible rubber material The GS W3001 features GS Web Technology which includes the highest steel content and the strongest connection materials...
Страница 5: ...l extend no less than 72 in 1830mm from all sides of the play structure Fall Height a 6 1830mm Height from surface The Fall height on the extennal surface of a pyramid shaped space net is the hightest...
Страница 6: ...th below Finished Grade 12 300mm P2 Depth of concrete footing 31 800mm Center Figure 4 Foundation section view Foundation Please refer to GS W3001 drawing for installation dimension Figure 3 Excavate...
Страница 7: ...ion anchor plate on concrete footing CF L anchor hole Front edge of anchor plate must be installed 4 100mm from the edge of concrete footing 100 200 100 Figure 5 Footing and anchor plate layout Anchor...
Страница 8: ...oden support frames 6 frames 3 11 1200mm L x 3 11 1200mm W x 39 1000mm H 3 frames 31 800mm L x 31 800mm W x 31 800mm H 1 frames 5 11 1800mm L x 5 11 1800mm W x 39 1000mm H Use min plywood not included...
Страница 9: ...ete footing work Pour wet concrete in the wooden support frame Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proceeding to next st...
Страница 10: ...GSWeb Playground Equipment 8 Remove the wood support frame Remove wood support frame from dry concrete blocks After concrete has cured enough remove frames and replace soil around footing to subgrade...
Страница 11: ...nd Equipment 9 Anchor Plate Assembly Figure 10 Attach Anchor plate to footing with flat washer locking washer and nut a b b Figure 9 Concreted blocks Clean threads of L Anchors b b Post plate a Anchor...
Страница 12: ...GSWeb Playground Equipment 10 STEP 1 Figure 11 Find Nylon String STEP 2 Figure 12 Insert Post following Nylon string Post Assembly Insert Post following nylon string Nylon string NOTE Remove string p...
Страница 13: ...14 U Bolt assembly STEP 4 Figure 15 Post cap assembly Place Cap on Post Thread the mast through the net s center per diagrams below or following factory installed guide string Press the cap already a...
Страница 14: ...able to A B A B C Safety Cable Attaching Attach safety cable to anchor plates A B C as shown in Figure 16 This will be repeated for the other three posts as outlined Figure 17 Safety cable Assembly Af...
Страница 15: ...layground Equipment 13 Safety Cable Attachment Figure 18 Repeat Step 1 on the second post Step 2 Figure 19 Safety cable attachment A B B STEP 1 A STEP 2 A B Working Process It is strongly recommended...
Страница 16: ...Stand remaining posts up Step 3 Step 4 Step 1 STEP 5 STEP 1 Step 2 Step 3 Step 4 STEP 2 STEP 3 STEP 4 Step 5 After standing up the Net Attach remaining safety rope and Turnbuckles Figure 21 Loosen Tur...
Страница 17: ...buckle Assembly M22 X L110 H T BOLT Anchor plate Turnbuckle a a b b b b a a NOTE Make sure post is level before tightening and remains level during process Use turnbuckles to straighten post to level...
Страница 18: ...damage the net It is also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Chec...
Страница 19: ...TRIPLE MAST NET CLIMBER MODEL NO GS W3001 GSWeb Playground Equipment 17 Tensioning Maintenance information...
Страница 20: ...ound Equipment 18 1 2 8 3 5 4 11 7 10 9 6 10 1 main post 2 multi compound rope 3 post cap 4 turn buckle 5 anchor shackle 6 shock proof ring 7 H T bolt nut washer 8 U bolt nut washer 9 main post plate...
Страница 21: ...Web Playground Equipment 19 Maintenance Installation 66 99 62 24 A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension...
Страница 22: ...risk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the...
Страница 23: ...c maintenance of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or c...