SINGLE MAST NET CLIMBER

MODEL NO.

GS-W1005

GSWeb Playground Equipment

1

INSTALLATION MANUAL

Safety Checklist after first assembly

Test intervals of  Safety: 6 months

Test Component and contents:

1. Removing the reticulated system:
- Check of removing condition each rope
- Screwing the turn buckle and conversion the turnbuckle

in anchors plate(see for this workstep turnbuckle assembly)

2. Abrasion condition of rope:
- Checking of all rope surface
- Strengthned of rope: Coating on the surface
3. Attachment condition of the anchors plate and turnbuckle
4. Screwing condition of all bolt
5. Galvanizing condition of  the steel component:
- Protection of steel component from corrosion.

Measure

In case of the appearance the defect detail is 
repaired usually within 3 days after checking.

GSWEB PLAYGROUND EQUIPMENT

1046-3, Najeon-ri, Saengnim-myeon, Gimhae-si
Gyeongsangnam-do, 621-821, Republic Of Korea   
Tel) +82. 55. 326. 9096~7  
Fax) +82. 55. 326. 9022
E-mail) [email protected]
Web site) www.gsweb21.com

Содержание GS-W1005

Страница 1: ...sion condition of rope Checking of all rope surface Strengthned of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galvanizing...

Страница 2: ...gest connection materials in the industry including a steel wire core in our edge ropes and connection points crushed in place with over 75 tons of pressure to ensure long life of the games and maximu...

Страница 3: ...TM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Fall Height 1500mm from surface The Fall height on the external...

Страница 4: ...ate enough materials to allow for proper depth of concrete footings Also ensure that there is enough space to allow the frame to be positioned properly Anchor wood support frame to ground with pickets...

Страница 5: ...ition anchor plate on concrete footing Figure 5 Footing and anchor plate layout Note Total distance from front of block to front of block is 20000mm Anchor Plate position 10000 10000 14142 Foundation...

Страница 6: ...rame a b Assemble wooden support frames 4 frames 1800mm L x 1800mm W x 1000mm H 1 frame 1200mm L x 1200mm W x 800mm H Use min plywood not included in package a wood jig for Anchor plate b wood support...

Страница 7: ...e work concrete footing work Pour wet concrete in the wooden support frame Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proceedin...

Страница 8: ...GSWeb Playground Equipment 8 Figure 8 remove wood support frame Remove wood support frame from dry concrete blocks After concrete has cured enough remove frames and replace soil around the footings to...

Страница 9: ...GSWeb Playground Equipment 9 Figure 9 Concreted blocks Clean threads of L Anchors Figure 10 Attach Anchor plate to footing with flat washer locking washer and nut a Anchor Plate b Post plate b Post p...

Страница 10: ...ound Equipment 10 STEP 1 Figure 11 Find Nylon String STEP 2 Figure 12 Insert Post as following Nylon string Nylon string Post Assembly Insert Post following nylon string NOTE Remove string prior to pl...

Страница 11: ...y STEP 3 Figure 13 Insert Post into the Center of Net Place Cap on Post Thread the mast through the net s center per diagrams below or following factory installed guide string Press the cap already at...

Страница 12: ...e to A B C Safety Cable Attaching Attach safety cable to anchor plates A B C as shown in Figure 16 A B C B C M22 X L110 H T Bolt Figure 17 Safety cable Assembly After successfully preparing the net an...

Страница 13: ...L NO GS W1005 GSWeb Playground Equipment 13 Figure 19 Safety cables attached Figure 18 Centre Post A C D E A E B C Working Process B D It is strongly recommended that a machine be used to lift the net...

Страница 14: ...b Playground Equipment 14 A B C D E F F C B D A E After standing up the Net Attach remaining safety cable and Turnbuckles Figure 20 Stand Net up Figure 21 Loosen Turnbuckle all the way about 100mm lea...

Страница 15: ...22 Tightening Turnbuckles a a b b Figure 23 Turnbuckle assembly M22 X L110 H T Bolt Tighten Cable with Turnbuclke at the Same time Tighten Cable with Turnbuclke at the Same time a a b b NOTE Make sure...

Страница 16: ...subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA and TUV maintan...

Страница 17: ...SWeb Playground Equipment 17 1 main post 2 multi compound rope 3 post cap 4 turn buckle 5 anchor shackle 7 H T bolt nut washer 8 U bolt nut washer 9 main post plate 10 L anchor bolt nut washer 11 Anch...

Страница 18: ...GSWeb Playground Equipment 18 Safety area and Fall Height zone A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension wi...

Страница 19: ...risk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the...

Страница 20: ...c maintenance of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or c...