GSWeb Playground Equipment GS-SC2101 Скачать руководство пользователя страница 1

GSWeb Playground Equipment 

E-mail) [email protected] 

Website) www.gsweb21.com 

Tel) +82 (0)55 326 9025 

Fax) +82 (0)55 326 9026 

65, Saengnim-daero 259beon-gil, Saengnim-Myeon 

Gimhae-si, Gyeongsangnam-do, Republic of Korea 

SPACE CRAFT 

MODEL NO. 

Rev_0 

2015.05 

GS-SC2101 

INSTALLATION MANUAL 

Safety Checklist after first assembly 

 

● 

Test intervals of  Safety: 6 months

 

● 

Test Component and contents:

 

1. Removing the reticulated system: 

- Check of removing condition each rope 

- Screwing the turn buckle and conversion the turnbuckle 

  in anchors plate(see for this workstep turnbuckle assembly) 

2. Abrasion condition of rope: 

- Checking of all rope surface 

- Strengthened of rope: Coating on the surface 

3. Attachment condition of the anchors plate and turnbuckle 

4. Screwing condition of all bolt 

5. Galvanizing condition of  the steel component: 

- Protection of steel component from corrosion.

 

 

● Measure

 

In case of the appearance the defect detail is  

repaired usually within 3 days after checking. 

 

 

Содержание GS-SC2101

Страница 1: ...s 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion c...

Страница 2: ...to the future with a space age look Children love the flying saucer design that helps their imaginations fly into orbit Our special bearing system controls the rotation speed so that the children can...

Страница 3: ...ODEL NO Rev_0 2015 05 GS SC2101 1 525 1 370 1 220 100 2 000 EN 1 830 ASTM 5 660 F L 1 450 2 250 F L 3 Safety area and Fall Height zone Fall Height and safety area Safety area The requirements for spac...

Страница 4: ...eongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 1 525 1 370 1 220 100 F L 2 250 4 Foundation Information Foundation Measure location and dig a hole 1525mm x 1525mm x 1370...

Страница 5: ...PACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 5 No 22 Angle Brace No 2 Inner Post No 21 Galvanized Base No A Net Overall Assembly Assemble the parts in the following order 1 Place nylon bearing on galva...

Страница 6: ...05 GS SC2101 60 54 6 Post installation NYLON STRING EYE BOLT 7 Screw the eye bolt to the top of the galvanized post 8 Lift the assembly and place in the hole inserting the post into the pre assembled...

Страница 7: ...daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 7 Wooden support frame Base Assembly No 22 Angle Brace No 101 M12 x 35 Bolt...

Страница 8: ...on gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 8 Half Ring Assembly Assemble the two half ring at the net with the nylon joint Align th...

Страница 9: ...beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 9 Deck Assembly No 41 Deck No 104 M10 X L100 Bolt Set No 106 M12 x L35 Bolt Set No 42...

Страница 10: ...82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 10 No 41 1 Deck Cover No 108 M8 x L20 Bolt Set N...

Страница 11: ...daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2101 11 Net and Cap Assembly No A Net No 6 Half RING Assemble net in the attach w...

Страница 12: ...e Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Post Cap 63 Nylon Joint 101 M12 x L35 Bolt Set 104 M10 x L100 RH Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L35...

Страница 13: ...Set No 105 M12 x L45 Bolt Set With L angle No 6 Half Ring No 41 Deck No 105 M12 x L45 Bolt Set With L angle No 112 Fix Bolt and Nut No 63 Nylon Joint Parts check list A Net 1 Outer Post 2 Inner post 6...

Страница 14: ...No 108 M8 x L20 Bolt Set No 61 L Angle No 107 M8 x L35 Bolt Set Parts check list A Net 1 Outer Post 2 Inner post 6 Half Ring 21 Galvanized Base 22 Angle Brace 23 Base Half Collar 41 Deck 41 1 Deck Co...

Страница 15: ...local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e...

Страница 16: ...asures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify...

Отзывы: