GSWeb Playground Equipment GS-N201 Скачать руководство пользователя страница 1

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gswebplay.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, 50802, Republic of Korea

THE BUTTERFLY

MODEL NO.

GS-N201

Rev_0

2018.04

1

INSTALLATION & MAINTENANCE INSTRUCTIONS

Completed Net

Features

The butterfly features GS Web Technology which includes 

the highest steel content and the strongest connection 

materials in the industry, including a steel-wire core 

in our edge ropes and connection points crushed in place with 

over 

75 tons 

of pressure to ensure long life of the games 

and maximum safety for the children.  

GS Web Nets help bring movement, balance, exercise and fun 

back into the playground.

Ages : 5 to 12 years

Capacity : 81 children

Size : L11.87m x W6.39m x H4.51m

Use zone : L16.01m x W9.36m

Содержание GS-N201

Страница 1: ...d Net Features The butterfly features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry including a steel wire core in our edge ropes an...

Страница 2: ...safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from a...

Страница 3: ...04 3 Foundation Information Attention Please refer to following details for foundation work Base plates are welded to the Rolling Hill s pipe After assembling pipes and nets fix the structure on the c...

Страница 4: ...EL NO GS N201 Rev_0 2018 04 160 180 160 500 160 180 160 500 SAND 2 x 4 3 8 x 100L SET ANCHOR CONCRETE 60 5 300 400 250 225 225 225 250 225 700 700 300 500 SAND 10 x 4 5 8 x 200L SET ANCHOR 139 8 300 5...

Страница 5: ...rea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 300 500 SAND 216 3 216 3 2 x 4 5 8 x 200L SET ANCHOR 325 350 450 350 325 1800 225 350 225 800 SAND 2 x 4 3 8 x 100L SET ANCHOR 60 5 300 400 190 180 160...

Страница 6: ...m do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 160 180 160 500 160 180 160 500 SAND 2 x 4 3 8 x 100L SET ANCHOR 300 400 25 SOCKET 250 175 175 175 250 175 600 600 300 500 SAN...

Страница 7: ...6 are frame s name From 11 to 20 are Post s name 2 To prevent any confusion Divide all parts into groups Outside and Inside as below Attention It is very important to keep the stickers attached on the...

Страница 8: ...9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 1 2 8 OVERALL ASSEMBLY Frame No 1...

Страница 9: ...9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 9 OVERALL ASSEMBLY Post No 15 Post 15 No 16 Post 16 No...

Страница 10: ...bplay com Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 10 OVER...

Страница 11: ...si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 11 OVERALL ASSEMBLY Net Overall Assembly Assemble the parts in the following order 1 Check the net s name 2 At...

Страница 12: ...m Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 12 OVERALL ASSEMBLY Net Overall Assembly Assemble the parts in the following order 1 Check the n...

Страница 13: ...beon gil Saengnim Myeon Gimhae si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 13 OVERALL ASSEMBLY Net Overall Assembly Assemble the parts in the following ord...

Страница 14: ...yeon Gimhae si Gyeongsangnam do 50802 Republic of Korea THE BUTTERFLY MODEL NO GS N201 Rev_0 2018 04 14 OVERALL ASSEMBLY Disk Overall Assembly for Climbing Ropes 1 Fix the Climbing ropes onto the conc...

Страница 15: ...rawn to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured agains...

Страница 16: ...uch measures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to s...

Отзывы: