- 21 -
GLC 100
button the Power LED starts flashing. A new network key between the two
EoC modems is generated and the devices establish a connection.
—> If you press the Security button less than one second or for more
than two seconds, no new network key is generated.
• Check the LEDs on the EoC devices. The Power LEDs must flash during the
connection establishment of the devices. Wait for approx. one minute while
the EoC devices get connected with each other. As soon as the procedure
is finished, the power LEDs are again permanently lit. If the Power LED is
not flashing after having pressed the Security button, you have pressed the
button for a too short or long time. Try it again and press the Security button
for one second. If the EoC LEDs are not lit on both EoC devices, the EoC
devices are not connected. In this case repeat the steps in this section.
i
ntegr ate
further
deviCes
:
• Hold the Security button of any EoC device of the private network depressed
for approx. one second. According to the "release" of the Security button
the Power LED starts flashing.
• Within the next two minutes press the Security button on the next EoC mo-
dem for approx. one second (its network key must be deleted before). Ac-
cording to the "release" of the Security button the Power LED starts flashing.
The network key of the first EoC modem is transferred to the device without
network key, a connection is established.
—> If no EoC connection can be established…
–
Reset devices which can not establish a connection to factory
defaults (page 19), delete the network key again and try again
to integrate the device to your private network.
–
Establish the connection using the configuration software which
can be downloaded under http://www.gss.de. The operation
of the configuration software is described from page 22 on.