![GSi TopDry Autoflow Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071077.webp)
Chapter 7: TopDry Drying Floor
Installing the Intermediate Chute
1. Install the angle dam (B) to each chute (A) using 1/4 x 3/4 in. HHCS bolts (C) and 1/4 in. hex
nuts (D).
2. Install the chute (A) to the intermediate chute bracket (E) using 1/4 x 3/4 in. HHCS bolts (C) and
1/4 in. hex nuts (D).
IMPORTANT:
Do not fully tighten the first hex nut (D). Lock the second hex nut (D) to the first hex
nut (D) and make sure the chutes raise and lower FREELY.
Figure 7-16
Installing the intermediate chute
A
Chute (TD-100017)
E
Intermediate chute bracket (TD-100078)
B
Angle dam (TD-100598)
F
U-Bolt (S-4748)
C
1/4 x 3/4 in. HHCS bolt (S-1429)
G
S-Hook
D
1/4 in. hex nut (S-1102)
PNEG-4936
36 Ft. TopDry Autoflow
77
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...