![GSi TopDry Autoflow Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071043.webp)
Chapter 5: Assembling Sidewall Sheets
Caulking and Bolting Detail for Standard Sidewall Sheets
To keep out moisture from overlapping the sheets, it is necessary to apply caulk to each sheet prior to
installing.
NOTE:
Always assemble the sidewall sheets with the overlap in the same direction.
Figure 5-2
Standard sidewall sheets (Viewed from the outside of the bin)
A
Vertical strip of caulk
B
10 in. (25.4 cm) Horizontal strip of caulk
1. Apply a strip of caulk near the outside edge of the outer sheet and between the outer two rows of
bolts (A), then apply a strip of caulk 10 in. (25.4 cm) long along the horizontal seams (B), as shown
in the figure below.
PNEG-4936
36 Ft. TopDry Autoflow
43
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...