Installing the Rack and Pinion
1. Make sure all gates are fully closed.
2. Slip the rack and pinion and the spacers (103) over center well and intermediate well control rods
(11 and 17). Align holes, making sure rack and pinion is fully extended toward bin wall.
3. With rack and pinion resting on unload tube and tube holes aligned, place the safety pins (16)
through the center and intermediate well control rods (11 and 17) to the rack and pinion tubes (18).
Figure 3-19
Installing the rack and pinion
11
Center well control rod
18
Rack and pinion
16
Safety pin
103
Rack and pinion control rod spacer
17
Intermediate well control rod
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty
33