Locating Discharge Opening
1. The last bolt hole in the chute should line up with the center of the discharge chute opening that is to
be cut. Therefore, you should be able to approximate an opening by measuring 9-1/2 in. above and
below the last bolt hole of the chute. Mark horizontal cut lines.
2. To find the vertical center of the chute opening, measure over 11 in. to the right and left of the chute
bolt rows. Mark center point. Then from the center point, measure 7 in. on both sides and mark verti-
cal cut lines.
3. Cut opening where marked, make sure corners have a minimum of 1-1/2 in. radius.
Figure 9-18
Locating Discharge Opening
A
22 in.
E
14 in.
B
11 in.
F
7 in.
C
19 in.
G
1-1/2 in. minimum radius at corners
D
9-1/2 in.
H
5
th
ring side sheet from base
PNEG-4472
72 Ft Diameter Z-Tek Bins
161
Содержание 40-SERIES
Страница 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...