background image

Date:2021.06 

Doc No:GSE-M-0001    Ver.A 

Installation guide for module 

Purpose of this guide

 

This guide contains information regarding the installation and safe handling of photovoltaic 
modules made by

  Gazio

ğlu S

olar Enerji  San.  Ve  Tic. A.

Ş.

 

hereafter is referred to as 

GSE

”. 

 

All  instructions  should  be  read  and  understood  before  installing  the  modules.  The 
installation of modules should conform to all the safety precautions in this guide when 
installing the modules. The local standards should also be followed in such installations. If 
there are any questions, please contact our sales department for further assistance. 
Before installing a photovoltaic system, the installer should be familiar with the mechanical 
and electrical requirements for such a system. Keep this guide in a safe place for future 
reference (maintenance). 
The mechanical and electrical installation of modules should consult the corresponding 
laws and regulations, such as electrical method, building law. 

Scope 

PV  modules  are  ideal  for  charging  storage  batteries  used  to  power  remote  homes, 
recreational vehicles, boats, telecommunication systems and other electrical applications. 
This manual contains important installation, maintenance and safety information. The word 
“module” as used in this manual refers to one or more PV modules. 

GSE

”  modules  are  designed  to  fulfill  the  criteria  of  protection  class  II  requirements 

according to IEC61730-part1. 
The modules are qualified for protection class II: Hazardous voltage (IEC61730: higher 
than 50V DC; EN61730: higher than 120V), hazardous power applications (higher than 
240W) where general contact access is anticipated (Modules qualified for safety through 
EN IEC61730-1 and -2 ). 

Disclaimer of liability: 

The installation techniques, handling and use of this product are beyond company control. 
Therefore, “

GSE

” does not assume responsibility for loss, damage or expense resulting 

from improper installation, handling or misuse. 

General Safety Information 

Ensure that the module is used only in applications for which it is suitable (see “Installing 

Modules”). All work on a PV system (installation, setup, maintenance) must be carried out 

only by appropriately qualified and authorized engineers. 

The appropriate DIN standards, construction rules and safety instructions must be followed 

during installation. 

Warning! 

PV modules generate electricity as soon as they are exposed to the sunlight. One 

Содержание GSE260-60P

Страница 1: ...munication systems and other electrical applications This manual contains important installation maintenance and safety information The word module as used in this manual refers to one or more PV modu...

Страница 2: ...Contact your local government for information regarding the collection systems available If electrical appliances are disposed of in landfills or dumps hazardous substances can leak into the groundwa...

Страница 3: ...ill be used for some caution items when unpacking transporting and storing the modules Do not strike and destroy the module Carry modules with both hands Do not use the connection socket as a handle D...

Страница 4: ...annual yield optimum orientation and tilt of PV modules is necessary Sunlight shining vertically onto the PV module is the best condition to generate maximum power Artificially concentrated sunlight s...

Страница 5: ...over a fire resistant roof covering rated for module s application Use the existing installation holes instead of drilling additional holes for installation Drilling holes shall against the reliabili...

Страница 6: ...0001 Ver A A minimum of four clamps must be located in the same colored zone to be certified to tested value If one of the clamps is in the different zone the lowest value should be taken in the accou...

Страница 7: ...that wiring is correct before starting the generator If the measured open circuit voltage Voc and short circuit current Isc differ from the specifications then there may be a wiring fault Correct con...

Страница 8: ...e factory installed diodes provide proper circuit protection for the system Rating of bypass diodes Current 10A Voltage 50V Others During installation be sure to tie the cable from the junction box to...

Страница 9: ...ctions we use a gentle cleaning implement such as a sponge and water from a hose without clean agents to rinse the modules Dried dirt must never be scraped or rubbed scraping and rubbing module surfac...

Страница 10: ...Open Circuit Voltage Voc V Tolerance 5 Maximum Power Voltage Vmp V Short Circuit Current Isc A Tolerance 5 Maximu m Power Current Imp A Maximu m Over Current Protectio n A GSE550 144M Mono crystallin...

Страница 11: ...otectio n A GSE260 60P Poly crystalline 60 260 38 06 30 80 9 08 8 44 20 A GSE265 60P Poly crystalline 60 265 38 18 31 03 9 12 8 54 20 A GSE270 60P Poly crystalline 60 270 38 30 31 29 9 16 8 63 20 A GS...

Страница 12: ...e 144 400 49 39 40 07 10 42 9 99 20 A GSEN395 144M Mono crystalline 144 395 49 18 39 86 10 38 9 91 20 A GSEN390 144M Mono crystalline 144 390 49 04 39 67 10 34 9 83 20 A GSEN385 144M Mono crystalline...

Страница 13: ...Date 2021 06 Doc No GSE M 0001 Ver A 13 GSEN315 120M Mono crystalline 120 315 39 90 33 19 10 08 9 49 20 A...

Отзывы: