background image

Gru

ndf
os
 c

o

mp
an

ie

s

Argentina

Bombas GRUNDFOS de Argentina S.A.
Ruta Panamericana km. 37.500 Centro 
Industrial Garin
1619 - Garin Pcia. de B.A.
Phone: +54-3327 414 444
Telefax: +54-3327 411 111

Australia

GRUNDFOS Pumps Pty. Ltd. 
P.O. Box 2040 
Regency Park 
South Australia 5942 
Phone: +61-8-8461-4611 
Telefax: +61-8-8340 0155 

Austria

GRUNDFOS Pumpen Vertrieb 
Ges.m.b.H.
Grundfosstraße 2 
A-5082 Grödig/Salzburg 
Tel.: +43-6246-883-0 
Telefax: +43-6246-883-30 

Belgium

N.V. GRUNDFOS Bellux S.A. 
Boomsesteenweg 81-83 
B-2630 Aartselaar 
Tél.: +32-3-870 7300 
Télécopie: +32-3-870 7301

Belarus

Представительство

 

ГРУНДФОС

 

в

 

Минске

220125, 

Минск

ул

Шафарнянская

, 11, 

оф

. 56

Тел

.: +7 (375 17) 286 39 72, 286 39 73

Факс

: +7 (375 17) 286 39 71

E-mail: [email protected]

Bosnia/Herzegovina

GRUNDFOS Sarajevo
Trg Heroja 16,
BiH-71000 Sarajevo
Phone: +387 33 713 290
Telefax: +387 33 659 079
e-mail: [email protected]

Brazil

BOMBAS GRUNDFOS DO BRASIL
Av. Humberto de Alencar Castelo 
Branco, 630
CEP 09850 - 300
São Bernardo do Campo - SP
Phone: +55-11 4393 5533
Telefax: +55-11 4343 5015

Bulgaria

Grundfos Bulgaria EOOD
Slatina District
Iztochna Tangenta street no. 100
BG - 1592 Sofia
Tel. +359 2 49 22 200
Fax. +359 2 49 22 201
email: [email protected]

Canada

GRUNDFOS Canada Inc. 
2941 Brighton Road 
Oakville, Ontario 
L6H 6C9 
Phone: +1-905 829 9533 
Telefax: +1-905 829 9512 

China

Grundfos Alldos
Dosing & Disinfection

ALLDOS (Shanghai) Water Technology 
Co. Ltd.
West Unit, 1 Floor, No. 2 Building (T 4-2)
278 Jinhu Road, Jin Qiao Export 
Processing Zone
Pudong New Area 
Shanghai, 201206
Phone: +86 21 5055 1012
Telefax: +86 21 5032 0596
E-mail: 
[email protected] 

China

GRUNDFOS Pumps (Shanghai) Co. Ltd.
10F The Hub, No. 33 Suhong Road
Minhang District
Shanghai 201106
PRC
Phone: +86-21 6122 5222 
Telefax: +86-21 6122 5333

COLOMBIA

GRUNDFOS Colombia S.A.S.
Km 1.5 vía Siberia-Cota Conj. Potrero 
Chico,
Parque Empresarial Arcos de Cota Bod. 
1A.
Cota, Cundinamarca
Phone: +57(1)-2913444
Telefax: +57(1)-8764586

Croatia

GRUNDFOS CROATIA d.o.o.
Cebini 37, Buzin
HR-10010 Zagreb
Phone: +385 1 6595 400 
Telefax: +385 1 6595 499
www.hr.grundfos.com

GRUNDFOS Sales Czechia and 
Slovakia s.r.o.

Č

apkovského 21

779 00 Olomouc
Phone: +420-585-716 111

Denmark

GRUNDFOS DK A/S 
Martin Bachs Vej 3 
DK-8850  Bjerringbro 
Tlf.: +45-87 50 50 50 
Telefax: +45-87 50 51 51 
E-mail: [email protected]
www.grundfos.com/DK

Estonia

GRUNDFOS Pumps Eesti OÜ
Peterburi tee 92G
11415 Tallinn
Tel: + 372 606 1690
Fax: + 372 606 1691

Finland

OY GRUNDFOS Pumput AB 
Trukkikuja 1
FI-01360 Vantaa   
Phone: +358-(0)207 889 500

France

Pompes GRUNDFOS Distribution S.A. 
Parc d’Activités de Chesnes 
57, rue de Malacombe 
F-38290 St. Quentin Fallavier (Lyon) 
Tél.: +33-4 74 82 15 15 
Télécopie: +33-4 74 94 10 51 

Germany

GRUNDFOS Water Treatment GmbH
Reetzstraße 85
D-76327 Pfinztal (Söllingen)
Tel.: +49 7240 61-0 
Telefax: +49 7240 61-177
E-mail: [email protected] 

Germany

GRUNDFOS GMBH
Schlüterstr. 33
40699 Erkrath
Tel.: +49-(0) 211 929 69-0 
Telefax: +49-(0) 211 929 69-3799
E-mail: [email protected]
Service in Deutschland:
E-mail: [email protected]

Greece

GRUNDFOS Hellas A.E.B.E. 
20th km. Athinon-Markopoulou Av. 
P.O. Box 71 
GR-19002 Peania 
Phone: +0030-210-66 83 400 
Telefax: +0030-210-66 46 273

Hong Kong

GRUNDFOS Pumps (Hong Kong) Ltd. 
Unit 1, Ground floor 
Siu Wai Industrial Centre 
29-33 Wing Hong Street & 
68 King Lam Street, Cheung Sha Wan 
Kowloon 
Phone: +852-27861706 / 27861741 
Telefax: +852-27858664 

Hungary

GRUNDFOS Hungária Kft.
Park u. 8
H-2045 Törökbálint, 
Phone: +36-23 511 110
Telefax: +36-23 511 111

India

GRUNDFOS Pumps India Private 
Limited
118 Old Mahabalipuram Road
Thoraipakkam
Chennai 600 097
Phone: +91-44 4596 6800

Indonesia

PT. GRUNDFOS POMPA
Graha Intirub Lt. 2 & 3
Jln. Cililitan Besar No.454. Makasar, 
Jakarta Timur
ID-Jakarta 13650
Phone: +62 21-469-51900
Telefax: +62 21-460 6910 / 460 6901

Ireland

GRUNDFOS (Ireland) Ltd. 
Unit A, Merrywell Business Park
Ballymount Road Lower
Dublin 12 
Phone: +353-1-4089 800 
Telefax: +353-1-4089 830 

Italy

GRUNDFOS Pompe Italia S.r.l. 
Via Gran Sasso 4
I-20060 Truccazzano (Milano)
Tel.: +39-02-95838112 
Telefax: +39-02-95309290 / 95838461 

Содержание SMART Digital S DDC Series

Страница 1: ...SMART Digital S DDC up to 15 l h Installation and operating instructions GRUNDFOS INSTRUCTIONS Further languages http net grundfos com qr i 95726994...

Страница 2: ...6 2 1 Navigation 19 6 2 2 Operating states 19 6 2 3 Sleep mode energy saving mode 19 6 2 4 Overview of display symbols 20 6 3 Main menus 21 6 3 1 Operation 21 6 3 2 Info 21 6 3 3 Alarm 21 6 3 4 Setup...

Страница 3: ...vention and any internal working operating and safety regulations of the operator must be observed Information attached to the pump must be observed Leakages of dangerous substances must be disposed o...

Страница 4: ...lation site should be applied e g wearing protective clothing Observe the chemical manufacturer s safety data sheets and safety instructions when handling chemicals Caution A deaeration hose which is...

Страница 5: ...water treatment Process water treatment Wash plants Chemical industry Ultrafiltration processes and reverse osmosis Irrigation Paper and pulp industry Food and beverage industries 2 2 Improper operat...

Страница 6: ...tion for deaeration hose at dosing head If the deaeration hose is not correctly connected danger will arise due to possible leakage of dosing liquid TM04 8144 1716 P Q U Type Model f Pmax Imax 9769487...

Страница 7: ...asket material EPDM FKM PTFE C SS Valve ball material Ceramic Stainless steel DIN 1 4401 F Control cube position Front mounted can be changed to the right or left 3 Voltage 1 x 100 240 V 50 60 Hz 1 2...

Страница 8: ...ns connection Control cube Graphic LC display section 6 2 2 Click wheel section 6 1 100 key section 6 1 Signal inputs outputs section 4 3 Mounting plate TM04 1175 3510 Deaeration valve Dosing head Val...

Страница 9: ...operation2 m 6 Max suction lift when priming with wet valves2 m 2 2 3 Min pressure difference between suction and discharge side bar 1 Max inlet pressure suction side bar 2 Max viscosity in SlowMode 2...

Страница 10: ...ical safety class II Pollution degree 2 Signal input Max load for level input 12 V 5 mA Max load for pulse input 12 V 5 mA Max load for External stop input 12 V 5 mA Min pulse length ms 5 Max pulse fr...

Страница 11: ...ons Fig 4 Dimensional sketch TM04 8169 3117 161 17 D B C A1 G 5 8 A 200 8 110 4 x 6 105 120 17 5 168 Pump type A mm A1 mm B mm C mm D mm DDC 6 10 280 251 196 46 5 24 DDC 9 7 280 251 196 46 5 24 DDC 15...

Страница 12: ...es Fig 6 Engaging the pump 4 1 4 Adjust control cube position The control cube is fitted to the front of the pump on delivery It can be turned by 90 so that the user can select to operate the pump fro...

Страница 13: ...ation example The pump offers various installation options In the picture below the pump is installed in conjunction with a suction line level switch and multifunction valve on a Grundfos tank Fig 9 I...

Страница 14: ...n the mains voltage is switched on Do not manipulate mains plug or cable Note The mains plug is the separator separating the pump from the mains The rated voltage of the pump see section 2 4 Nameplate...

Страница 15: ...evel signal Relay outputs Applies to DDC AR control variant Function Pins 1 brown 2 white 3 blue 4 black Analog GND mA mA External stop GND X Pulse GND X Function Pins 1 2 3 4 Low level signal X GND E...

Страница 16: ...light the desired language 6 Press the click wheel to select the highlighted language 7 Press the click wheel again to confirm the Confirm settings prompt and apply the setting Fig 11 Set menu languag...

Страница 17: ...sure that deviates or if dosing a medium whose viscosity deviates the pump must be calibrated Requirements The hydraulics and electrics of the pump are connected see section 4 Assembly and installatio...

Страница 18: ...p executes 200 dosing strokes and displays the factory calibration value e g 125 ml 6 Remove the suction hose from the measuring beaker and check the remaining volume V2 e g 170 ml 7 From V1 and V2 ca...

Страница 19: ...hlighted in black in the sub menus When you position the cursor on a value and press the click wheel a value is selected Turning the the click wheel clockwise increases the value turning the click whe...

Страница 20: ...3 Info Alarm Setup Back SlowMode Sect 6 5 Key lock Sect 6 6 Manual Sect 6 4 1 Pulse Sect 6 4 2 Analog 0 4 20 mA Sect 6 4 3 Running Standby Stop Deaerating Diaphragm position out Sect 7 Additional disp...

Страница 21: ...ll be overwritten see Section 8 Faults 6 3 4 Setup The Setup main menu contains menus for pump configuration These menus are described in the following sections Menu Pulse memory is only displayed in...

Страница 22: ...wheel The setting range for the dosing volume depends on the pump type The frequency of incoming pulses is multiplied by the set dosing volume If the pump receives more pulses than it can process at...

Страница 23: ...ode If the code is not entered within 10 seconds the display automatically switches to the Operation main menu The key lock remains active 6 6 2 Deactivation The key lock can be deactivated in the Set...

Страница 24: ...hes from the operating state Running into the operating state Standby The corresponding symbol appears in the Signal error display area of the display The contact type is factory set to closing contac...

Страница 25: ...e any questions please contact your service partner 7 1 Regular maintenance 7 2 Cleaning If necessary clean all pump surfaces with a dry and clean cloth Fill level sensor Pump status Low level Display...

Страница 26: ...formation about carrying out maintenance can be found in the service kit catalog on our homepage www grundfos com 7 4 1 Dosing head overview Fig 23 Dosing head exploded view Service requirement Motor...

Страница 27: ...nothing indicates that dosing liquid has entered the pump housing Otherwise proceed as described in section 7 6 2 Dosing liquid in the pump housing This section refers to fig 23 1 Attach flange 2 corr...

Страница 28: ...ead before maintenance and flush it if necessary 3 Take suitable steps to ensure that the returning liquid is safely collected 4 Dismantle suction pressure and deaeration hose 5 Remove the cover 9 6 L...

Страница 29: ...indicates an alarm and the pump is stopped The last 10 faults are stored in the Alarm main menu When a new fault occurs the oldest fault is deleted The two most recent faults are shown in the display...

Страница 30: ...sing medium tank almost empty Motor blocked Alarm Backpressure greater than nominal pressure Damage to gears Reduce backpressure Arrange for repair to drive if necessary Cable break Alarm Defect in an...

Страница 31: ...suction line install filter Suction lift too high Reduce suction lift Install priming aid Enable SlowMode see section 6 5 SlowMode Viscosity too high Enable SlowMode see section 6 5 SlowMode Use hose...

Страница 32: ...FOS CROATIA d o o Cebini 37 Buzin HR 10010 Zagreb Phone 385 1 6595 400 Telefax 385 1 6595 499 www hr grundfos com GRUNDFOS Sales Czechia and Slovakia s r o apkovsk ho 21 779 00 Olomouc Phone 420 585 7...

Страница 33: ...11 26 48 340 Singapore GRUNDFOS Singapore Pte Ltd 25 Jalan Tukang Singapore 619264 Phone 65 6681 9688 Telefax 65 6681 9689 Slovakia GRUNDFOS s r o Prievozsk 4D 821 09 BRATISLAVA Phona 421 2 5020 1426...

Страница 34: ...6994 0817 ECM 1214328 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright...

Отзывы: